Loading...
TR9303-CS 940419April 19, 1994 MEMORANDUM To: Ken Griffin Mike Martin From: Allen Ross ~- JBM Engineers'& Planners RE: Information requested in letter dated 4/13/94 In addition to information requested in referenced letter, JBM Engineers & Planners would be interested in receiving any design criteria related to roadways, utilities, or storm drainage facilities. This criteria will enable JBM to better estimate the costs of the proposed projects in the CIP.