Loading...
Riverchase (4)-CS 930215 The C~ty Witl~ A Beautiful Future February 15, 1993 PO Box 478 Coppell, Texas 75019 214-462-0022 Mr. Jerry W. Ragsdale Republic Property Group, Inc. 8440 Walnut Hill Lane, 8th Floor Dallas, TX 75231 Re: Riverchase Estates Final Acceptance Dear Mr. Ragsdale: A final inspection of the above-referenced project has been confirmed by representatives of the City of Coppell subject to the various maintenance agreements. The drainage utility and paving has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion Control Bond will be two years from this letter. Construction Inspector CC: Steve Goram, Director of Public Works Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Greg Jones, Acting Building Official Bub Murray, Murray Construction Mike Boney, Site Concrete Don Tipton, Tipton Engineering finalacc.riv