Riverchase (4)-CS 930215 The C~ty Witl~ A Beautiful Future
February 15, 1993
PO Box 478
Coppell, Texas 75019
214-462-0022
Mr. Jerry W. Ragsdale
Republic Property Group, Inc.
8440 Walnut Hill Lane, 8th Floor
Dallas, TX 75231
Re: Riverchase Estates
Final Acceptance
Dear Mr. Ragsdale:
A final inspection of the above-referenced project has been confirmed by representatives of the
City of Coppell subject to the various maintenance agreements.
The drainage utility and paving has been verified and is in compliance with the City of Coppell
standard requirements. Erosion protection will also be maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion
Control Bond will be two years from this letter.
Construction Inspector
CC:
Steve Goram, Director of Public Works
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, Civil Engineer
Greg Jones, Acting Building Official
Bub Murray, Murray Construction
Mike Boney, Site Concrete
Don Tipton, Tipton Engineering
finalacc.riv