Riverchase (4)-CS 92081201/12/~ ~0~ CITY OF COPPELL 006
TIPTON ENGINEERING, IN . .
ENGINEERING · sURvEYING · PI~ANNING
6330 BeltDne Road * Suite C · Garland, Texas 7[5043 * 1214} 220-2967 * FAX 22,§-1946
3758
August 12, 1992
Mr. Ken Griffin
CIg"f OF COPPELL
255 Parkway Blvd
Coppe11, TX 75019
COPPELL, TX
Dear Mr. Griffin:
Herewith is a ~py of paving add excavation contract and a copy of
the utility improvements contract for your use in verifying the
inspection fee for the above referenced project.
Street, Alley & slope
Compacted Fill (Haul In)
Water Mains
Sanitary Sewer Mains
Storm Drainage
Paving
Z6tS00 CY @ $1.25 = $ 33
2,240 CY @ $5.25 = 11
176
162
144
541
125.00
760.00
444.20
374.25
.982.35
702.30
$1,070,388.10
01/12/93 15:04 CITY OF COPPELL
/' -~
00?
Pgge 2
RlYerohass Addition
August lZ, 1992
our calculation of the inspection fee at 2% is $21,407.76. Please
not~.fy us if this is acceptable.
If yOU need any additional information we can furnish at this time,
please do not hesitate to contact our office.
Sincerely,
TIPTON ENGINEERING, INC.
Richard Hovas, P.~.
Vice President
RH/ce
Enclosure