Loading...
ST9302-CS021226FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354..0787 DALLAS. TEXAS 75220 December 26, 2002 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019c4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: During the course of the utility work on this project our utility subcontractor procured materials for several items of work that were subsequently deleted from the scope of work. The material suppliers will not allow M-CO to return several of these items. Since these materials were procured prior to the removal of the items of work, M-CO should be reimbursed for the material. The cost for the following items need to be added to the next change order: 16" CL 165 DR25 PVC water line 48" prefabricated manhole base 440 LF $10.01/LF $4,404.40 12LF $127.94/LF $1,535.28 Total $5,939.68 M-CO's original invoices for these materials are enclosed for your records. The prices above represent the material cost plus the allowable profit and overhead for the items. If you have any questions regarding this issue, don't hesitate to contact our office. °nlt~ti°n Roben D. Weber Project Manager Company AN EQUAL OPPORTUNITY EMPLOYER FROM :. M-CO CONSTRUCTION INC. "--~' ' ~~PIPE & SUPPLY, INC. PHC~ NO. : Bi7 S89 9155 De=c. 03 ~'002 10:58RM PiS CORPORATE OFFICE - HOUSTON, TEXAS (713) 937-0600 (800) 231-9808 P.O. BOX 4346 - DEPT 190 HOUSTON, TX 77210.4346 1056 .Q 2 M-CO CONSTRUCTION INC. ~ JOB; ALFOPCD 6816 HAR/~ONSON RD. ~ C/O M-CO N.RIC~{I,AND HILL, TX 76180 I SANDy LAKw & MOOR.~ R.D COPPELL, TX 1 10/20/98 I 10/06/98 85 NS': 30 DAYS NOTAX 072794 50 FFA 02251600 16" CLASS 165 DR 25 FVC PIPE 2600.00 ~000.00 600.00 PT 8.700 PT 17400.00 · . 17400.00 .00 .00 .00 .00 17400.00 FROM '- M-CO CONSTRUCTION INC. PHONE NO. : 817 589 9155 ' ORIGINAL INVOICE '"' ?" Hanson SOLO TO: H-CO CONSTRUCTION 6816 HARHONSONRD N RICHLAND HILLS, TX 76180 Dec. 03 2~2 10:ssAM P4 SHiP TO: ~(MANHOLES) SANDY LAKE ROAD PAVING & DRAIN COpPELL, TX TX FOB DESTINATION L35047~8' RG 2' EH RISER PROFILE 4.00 ~.Z 52.00 208.00 [8" RG 3' J/H RISER PROFILE 6.00 bF 52.00 312.00 ~L8.~" RG 4' P/C ~B-~'.~ROFILE ....... 12.00 GF 111.25 1335.00 ~8" RG 2.5' ~ CO~ 7.50 LF 52.00 390~00 ~4" G~E 2" ~NGS 6.00 EA 14.00 84.00 ?IPE LUBE-8 LB/1 'G~ PAIL 1.00 EA .00 N/C ~8' ISOP~ PROFILE GASKET N 10.00 EA .00 N/C ~-L~ED ~8" RG 1.5' ~ RISER PROFILE 4.50 ~F 52.00~%~ ~ 234.00 ~T' 30 DAYS 120001 D~S, TE~ 75312-0776 51.00 ~ ~v~ ~.~. (214)525-5898 S .00~o. '~ 2563~0~