Loading...
PA9702-LR 990720 (3)CONCRETE COMPRESSIVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/02/1999 Report No.: 9918101 Report Date 07/20/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. t~)6051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Ass0c. CONCRETE CLASS: N/A CONCRETE SVPPLIER: Nelson Brothers PLACEMENT DATE: 07/02/1999 BATCa TWIn: N/A PLANT: N/A TEX4E SAMPLED: 1:45pm BY: Mario Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, windy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 97 F CONCRETE: 94 F SLUMP: 3-5" TRUCK NO: 219 TICKET NO: 74476 AIR: N/A AIR CONTENT (%): N/A uNrr WEIGBT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Left turn lane going eastbound on Parkway BIrd. from west side of 282' east and west ASTM C- 172 approach 36' east and west ASTM C-39 SAMPLE LOCATION: REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 07/09/1999 7 126910 4490 1 2 5.50 07/09/1999 7 122120 4320 Average 4410 1 3 5.50 07/30/1999 28 1 4 5.50 07/30/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH ST ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/02/1999 Report No.: 9918101 Report Date 07/20/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texa's/Prj. #96051 Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/02/1999 BATCH TIME: N/A PLANT: N/A TWIn SAMPLED: 3: 15pm BY: Mario Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, very cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 92 ? SLtnVW: 3-5" TRUCK NO: 216 TICKET NO: 74487 AIR: N/A Am CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 70 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.50 07/09/1999 7 97890 3460 2 2 5.50 07/09/1999 7 103750 3670 Average 3570 2 3 5.50 07/30/1999 28 2 4 5.50 07/30/1999 28 Sample location: Turn lane from west side: 237' and 15' north Technician: Mario Garcia Started: l:00pm Finished: 4:30pro ~ .t/E~ Report Distribution: ( 1 ) City of Coppell ( 1 ) City of Coppell - Engineering ( 1 ) Brinkley Sargent Architects ( 1 ) City of Coppell - BIdg. lnsp. Eugene Harbour (1) Turner Engineers (1) City of Coppelt - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 2