Loading...
ST9302-CS021226 (2)FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 December 26, 2002 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 ae~ Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-3llf Dear Mr. Griffin: During installation of the storm sewer on the referenced project, the proposed storm sewer system was modified at the direction of the City to accommodate utilization of the existing storm sewer system. These modifications required the utilization of several additional concrete collars for connections between storm sewer lines. As a result, EBCC submits the following items for inclusion on the next change order: Item Description Quantity Unit Price Extension CONCRETE COLLAR FOR 21" RCP 8.00 EA $400.00 $3,200.00 CONCRETE COLLAR FOR 24" RCP 1.00 EA $445.00 $445.00 CONCRETE COLLAR FOR 36" RCP 8.00 EA $530.00 $4,240.00 Total $7,885.00 Your attention regarding this matter is greatly appreciated. This work required an additional ten (10) calendar days to complete. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, C°nstL~!ti°n Robert D. Weber Project Manager Company AN EQUALOPPORTUNITYEMPLOYER