Loading...
ST9302-CS021227FAX (214) 352-3201 3HONE (214) 3584581 ED SELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 December 27, 2002 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 00940600 DWU Project #: 98-311F Dear Mr. Griffin: During the course of the installation of conduit in the median on the referenced project, our electric/signal subcontractor was directed by the City to install 2" conduit for future street lights. This work has been billed and paid on several occasions utilizing the item for 2" SCH 40 PVC (Open Cut) that was established by a previous change order. This work was removed from the last pay estimate by the City without explanation. This work was completed during the course of EBCC's work on Sandy Lake and under the protection of EBCC's bonds, barricades, and insurance. Our subcontractor completed the work with the understanding that they were executing the work in accordance with the subcontract between EBCC and Mel's Electric for the referenced project. Please adjust the final quantity for the 2" SCH 40 PVC (Open Cut) pay item to 10,320 LF to reflect the actual work completed. With regard to the additional time required to complete this work, please add twenty eight (28) calendar days to the contract duration for this extra work. If you have any questions regarding this information, don't hesitate to contact our office. Sincerely, , /} {~)~ ~ell Cons~x~tion Company Robert D. Weber Project Manager AN EQUAL OPPORTUNITY EMPLOYER