Loading...
ST9302-CS000118Sent. By: EBCC; FAX (214) 3~2-3201 2143523201; Jan-18-00 5:10PM; Page 2/3 TELEPHONE(214)35e~ul ED BELL CONSTRUCTION COMla'ANY POST OFFICE BOX 540rs7 10E0S HARRY HINES DALLAS, TEXAS 7S3~4-07S7 DALLAS, TEXAS 752,20 January 18, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engincenng and Public Works City of Coppell 255 Parkway Blvd. Coppell, Tcxas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: We have reviewext the Dcccmber 1999 plans for the extension of thc Coppell 30" water line from the end of the current project to the water storage tank facility on Kimble Court. Based upon the quantities indicated on the plans, the following existing pay items will need to bc adjust~ for quantities and/or price: Item 85 30" RCCP Water Line 929 LF $100.00 $92,900.00 ltcm 86 24" RCCP Water Line 24 LF $150.00 $3,600.00 Item 91 6" DIP Watcr Line 26 LF $38.00 $988.00 Item 93 30" Gate Valve 1 EA $35,000.00 $35,000.00 Item 97 6" Gate Valve 1 EA $650.00 $650.00 Item 100 Fire Hydrant 1 EA $2,100.00 $2,100.00 Item 117 Trench Safety 929 LF $0.10 $92.90 The following additional pay items will need to be established: 36" Closure 1 EA 24" Closure 2 EA 6" Concrete Pavement Repair ILS 4" HMAC Pavement Repair 1724 SY $10,000.00 $10,000.00 $8,000.00 $16,000.00 $8,000.00 $8,000.00 $22.00 $37,928.00 Based upon the quantities identified, the total price for this change order is $207,258.90. Oar prices include an $8.46 per LF price increase for the 30" RCCP water line, cost for thc additional survey required, cost for the 'additional clean up, and cost for thc additional bond premium. Due to thc location of the water linc. we have priced this work with the a~sumption that Kimble Court AN EQUAL OPPORTUNITY EMPLOYER Sent By: EBCC; 2143523201; Jan-18-00 5:10PM; Page 3/3 Page 2 Sandy Lake Roa~l Reconstruction Kc: 30" RCCP Water Line Extension can be closed; therefore, wc have not included any temporary patching of K/mble Court. After the water line has been tested, EBCC would r~air the existing subgrade and have 4" of HMAC laid to restore thc roadway. Our prices specifically exclude repair or replacement of'the existing rock "retaining walls" between MacArthur and Kimble Court. For s/mplicity, we attempted to maintain thc prices for the existing pay items at their contract amounts; however, the cost increase for the 30" RCCP necessitated increasing our price for that item. The labor, equipment, and other material costs for the existing pay itc-ms were not increased. The remaining overhead iocrcascs wore distributed on the 30" RCCP water Linc item and the/'our new pay items. We will need an additional 30 calendar days to complete this work. lfyou have any qucstions t:garding this information, don't hesitate to con'tact our office. Sincerely, C~nst~tion Company Robert D. Weber lh'oj ~t Engineer xc; Michael G. DeMott~, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 2143523201 Sent' By: EBCC; 2143523201; Jan-18-00 5:0gPM; Page 1 ED BELL CONSTRUCTION COMPANY P.O. BOX 540787 DALLAS, TX 75354-0787 FACSIMILE T~ANSMITTAL SHEET Robat D. Weber ' SENDEZ~'S I~EFE:~t''x~ ~' ' RE: [] pLPASE COMMENT [] PLEASE REPLY [] PLEASE RECYCLE