January 18, 2000
Mr. Kenneth M. Griffin, P.E.
Director of Engincenng and Public Works
City of Coppell
255 Parkway Blvd.
Coppell, Tcxas 75019-4409
Re:
Sandy Lake Road Reconstruction
Coppell Project #: ST 93-02
Kimley-Horn Project #: 06940600
DWU Project #: 98-311F
Dear Mr. Griffin:
We have reviewext the Dcccmber 1999 plans for the extension of thc Coppell 30" water line from
the end of the current project to the water storage tank facility on Kimble Court. Based upon the
quantities indicated on the plans, the following existing pay items will need to bc adjust~ for
quantities and/or price:
Item 85 30" RCCP Water Line 929 LF $100.00 $92,900.00
ltcm 86 24" RCCP Water Line 24 LF $150.00 $3,600.00
Item 91 6" DIP Watcr Line 26 LF $38.00 $988.00
Item 93 30" Gate Valve 1 EA $35,000.00 $35,000.00
Item 97 6" Gate Valve 1 EA $650.00 $650.00
Item 100 Fire Hydrant 1 EA $2,100.00 $2,100.00
Item 117 Trench Safety 929 LF $0.10 $92.90
The following additional pay items will need to be established:
36" Closure 1 EA
24" Closure 2 EA
6" Concrete Pavement Repair ILS
4" HMAC Pavement Repair 1724 SY
$10,000.00 $10,000.00
$8,000.00 $16,000.00
$8,000.00 $8,000.00
$22.00 $37,928.00
Based upon the quantities identified, the total price for this change order is $207,258.90. Oar
prices include an $8.46 per LF price increase for the 30" RCCP water line, cost for thc additional
survey required, cost for the 'additional clean up, and cost for thc additional bond premium. Due
to thc location of the water linc. we have priced this work with the a~sumption that Kimble Court
AN EQUAL OPPORTUNITY EMPLOYER
Sent By: EBCC; 2143523201; Jan-18-00 5:10PM; Page 3/3
Page 2
Sandy Lake Roa~l Reconstruction
Kc: 30" RCCP Water Line Extension
can be closed; therefore, wc have not included any temporary patching of K/mble Court. After
the water line has been tested, EBCC would r~air the existing subgrade and have 4" of HMAC
laid to restore thc roadway. Our prices specifically exclude repair or replacement of'the existing
rock "retaining walls" between MacArthur and Kimble Court.
For s/mplicity, we attempted to maintain thc prices for the existing pay items at their contract
amounts; however, the cost increase for the 30" RCCP necessitated increasing our price for that
item. The labor, equipment, and other material costs for the existing pay itc-ms were not
increased. The remaining overhead iocrcascs wore distributed on the 30" RCCP water Linc item
and the/'our new pay items. We will need an additional 30 calendar days to complete this work.
lfyou have any qucstions t:garding this information, don't hesitate to con'tact our office.
Sincerely,
C~nst~tion Company
Robert D. Weber
lh'oj ~t Engineer
xc;
Michael G. DeMott~, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100
Fort Worth, Texas 76102-6803
2143523201
Sent' By: EBCC; 2143523201; Jan-18-00 5:0gPM; Page 1
ED
BELL CONSTRUCTION COMPANY
P.O. BOX 540787
DALLAS, TX 75354-0787
FACSIMILE T~ANSMITTAL SHEET
Robat D. Weber
' SENDEZ~'S I~EFE:~t''x~ ~' '
RE:
[] pLPASE COMMENT [] PLEASE REPLY [] PLEASE RECYCLE