Securelock-CS040122 (2)Project:
Date:
DEVELOPMENT FEE TABLE
Securelock Self-Storage ~
1/22/2004
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,640.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $200.00
( I00% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $62.25
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $4,390.16
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $700.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee '$50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $10,153.44 $10, 153.44
'(I00% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $19,365.85
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $10,153.44
DEVELOPMENT FEE WORKSHEET
PROJECT: Securelock Self-Storage revised
DATE: 1/22/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch = 2.5 ESU's
1 - 2 inch 8 ' ESU's
0 0 ESU's
2 - 8 inch 2.5 ESU's
Total #: 13 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 .C°nnecti°ns @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $62.25
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @ $205.28
Total #: 0 Additional Irrigation Meter(s) @ $0,00
Total #: 2 Fireline Meter(s) @ $2,092.44
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 2.5
(Due prior to issuance of building permit)
@$280.00 ea.
Wastewater Tap ]Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50,00 ea,
(100% due prior to issuance of building permit)
$3,640.00
$2OO.OO
$62.25
$205.28
$0.00
$4,184.88
$3O.O0
$90.00
$700.00
$50.00
$50.00
$0.00
$0.00
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Page I
DEVELOPMENT FEE WORKSHEET
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$10,153.44
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Securelock Self-Storage revised
DATE: 1/22/2004
ROADWAY IMPACT FEE:
Service Area * 9
Cate[gory ** Industrial
Land Use ** Mini-Warehouse
Building Area (sf) 51,280
, Development Units ** 51.28
Vehicle Miles per Development Unit ** 0.66
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $10,153.44
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)