Securelock-CS040122 (2)Project: Date: DEVELOPMENT FEE TABLE Securelock Self-Storage ~ 1/22/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,640.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 ( I00% due at Issuance of Water Meter) Water Meter Fee (Domestic) $62.25 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,390.16 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $700.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee '$50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $10,153.44 $10, 153.44 '(I00% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $19,365.85 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $10,153.44 DEVELOPMENT FEE WORKSHEET PROJECT: Securelock Self-Storage revised DATE: 1/22/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 ESU's 1 - 2 inch 8 ' ESU's 0 0 ESU's 2 - 8 inch 2.5 ESU's Total #: 13 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 .C°nnecti°ns @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $62.25 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: I Irrigation Meter(s) @ $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0,00 Total #: 2 Fireline Meter(s) @ $2,092.44 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2.5 (Due prior to issuance of building permit) @$280.00 ea. Wastewater Tap ]Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50,00 ea, (100% due prior to issuance of building permit) $3,640.00 $2OO.OO $62.25 $205.28 $0.00 $4,184.88 $3O.O0 $90.00 $700.00 $50.00 $50.00 $0.00 $0.00 Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Page I DEVELOPMENT FEE WORKSHEET Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $10,153.44 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Securelock Self-Storage revised DATE: 1/22/2004 ROADWAY IMPACT FEE: Service Area * 9 Cate[gory ** Industrial Land Use ** Mini-Warehouse Building Area (sf) 51,280 , Development Units ** 51.28 Vehicle Miles per Development Unit ** 0.66 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $10,153.44 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)