Securelock-CS030912 (3)DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
OR G NAT ON DATE:
Dowdey, Anderson & Assoc
Securelock Self Storage
9/12/2003
SENT
9/12/2003
1/22/2004
1/22/2004
11/6/2003
9/12/2003
ASSESSMENT
Water Impact Fee
Wastewater Impact Fee
revised water impact
revised wastewater
ASSESSED FEE AMOUNT PAlI- DATE
$5,180.00 $5,180.00 bh 1/6/2004
$2,240.00 $2,240.00 bh 1/6/2004
$3,640.00
$700.00
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
n/a
$16,760.88 $16,760.88 rb 10/21/2003
$6,426.62 $6,426.62 pc 11/12/2003
$200.00 100,OO $100.00 mc 1/23/2004
$50.00
$62.25
$4,390.16 ~.?,~, $4,184.88 mc 1/23/2004
$30.00
$90.00
$50.00
~Subtotal to Eng.
$23,187.50 $23,187.50 $0.00
TOTALS
Total Fees Fees Paid Amount Owed
$32,399.91 $34,892.38 ($2,492.47
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd,
Const, Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd,
Erosion Control Maint.