Riverchase (6.2)-CS 980720Prep,- -
Approve~ by
Fax Note 7671
21~ 504 5590
CIT-Y OF COPPELL ENGINEERING ~ CITY 05
Co
]PPELL NO. 110
OPPELL ~,~J, E. NO
ENTRY
POSTED BY:
F*'UND:
~ DATE: ~-~o~ DATE:
DESCRIPTION ACCOUNT
, NUMBER
~ ,,
~ ...... ~j ..'-- ~~va ,., ,,,&~
~ ~' ~..~ /.~/ ,,
~. ....
CITY OF COPPELL ENGINEERING ~ CITY OF-~OPPELL
~[~VELOPMENT FEE TABJ~
NO, 110
Project: Grand Car Wa~k Add~, Lot 1
Date: ?/20/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
kPPROYAL
~ Water Impact Fee $3,600.00 .~ $3.600.00
(100~ due prior to Council Approval)
Water 'Tap Inspection Fee $~50.00
(100~ due at Issuance of Wate~ Meter) J
Water Meter Fee 03ome~tic) ~/ $192.15
_(100% due at [smunce of Wa~"riMe~')
Water Meter Fee ('h~isation/Fireime) $0.00
(100~ due at l.~-uance of WaterlMe~-r)
Water Meter Deposit (Domestic) ,' S35.00
(t00 % due at Iss,,n-ce of Water i~eter)
lrrig~tion/F~reliae Meter l~sit $0.00
(100% due at Xssunnce of Water Meter)
Wa~tewater ImPact Fee $3,600.00 $3,600.00
(100~ due prior to Council Appto,,ml)
Wastewater Tap Inspection Fee $50.00
Utility Final lmpection Fee $50.00
(100 · due at ls.~mnce of Buildin~ Permi0
Park Fee .$0.0~}
(100% due prior, .to Council A .pl~. vai)
Roa,~way Impact Fee ${J.00 $0.00
(I00% due prior to. Council Appr0vnl) ...
Street Light Fee Infornmmm ~
(100 ~. due prior to Acceptance of Project av,~,,h~ at mi~ ~
Street Sign Fee Information nm
~.(.100% du.e prior to Acceptance oi~ Project ,vaitele at ~ ~
Construction Inspection Fee Ne~d ~ of
tOTAL $=/,$77.15
TOTAL AMOUNT DUE PRIOR TO COUNCIL AI~ROV~ .$~
~)? 25 98
/
,PROJECT:
11:4~
CITY OF COPPELL ENGINEERING ' CITY OF ~OPPELL
r~ELOPMENT FEE WORKSHP.~I~'
G..~d Cm. W'~A ~_~,~_-,~. ~ I (Copp~ Comwm)
?/~0/~
Imp.ct Fee:
D~mes~c ~er(s):
In~gat~n Meter(s):
Fireline Meter(s):
= 8 ESU'$
= ESU'.
= ESU's
= ESt./'.
Tota~ #: 8 ESt.rs O $,4~0.00 ea.
(100% du~ prior to C~uno1 approval of ~ final p~t)
IYa,ter Tap Inspection Fee:
Total #: I Co~nodJofls 0 LqO,00 ea.
(sir~e femay due prkr to
Dotaestic Water Meter Fee:
Total #: I Domos~ MMm'(s) ~ $'~92.15
(Single family clue prim to isr, u~ce of building pema)
(AJI o,'~r dew;opment~ clue prim to issuance of meter)
lrrlgation/Fireline Water Meter Fee:
Total #: 0 Ir,'igation Me~(s) ~
TO(al ~.. 0 Udit~onBI Irf~Jon Meter(s) ~
Tota~ #: 0 F'u'elble Metes) ~
'(100% due prior to iss ,Uanco of water meters)
Do~z,,cstic Water Meter Deposit Fee:
Tolal ~. I Meter(s) 0
(100% due prior to iss~rance of water meters)
Irrigation/Fire Meter Deposit Fee:
To~. 0 ~t~s) O s3o.ooea.
(10o% due prior to ~,_,ance ~ water metro3)
Wz~l,ewater Impact Fee.*
TOMI Domestic Mete.~ ESU's:
8
WMt,ewater Tap Inspection Fee:
Total ~. t GonneoUons ~ ~'k~O.O0 ea.
(loo% due prkx to Muanoo of txddb~0 pem~t)
Utility Find Inspection Fee (AU developmeuf~):
Total #: 1 Lots 0 $50.00
0 00% due prkx to Juuance of buga~g pemdt)
NO. 110
$192.15
IP~ge 1
11:44
CITY OF COPPELL ENGINEERING ~ CITY OF ~OPPELL
FEE WORKS HE~I'
NO, lIB
Fee (For ResldenUal Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Mul~-family · $75.00 1Un~
(50% paM prior to COuncil OOI~WBI of ~rml plat)
(50% paid at tssuafl~o of buMlflg pmmit)
Preliminary plat approved after Jane 23, 1992:
N/A
N/A
Preliminary plat approved after October 26, 1993:
NIA Single-family ~ S1285.001 Lot
N/A Mulli-family ~ $1285.00 / Unit
(lOO% pay p.o~ cou~ epprov~ of fln~ pm)
Roadway Impact Fee:
(See atmc~ed fee cadcula~fls)
SLoe,et Ligb~g Fees:
Assessed for f~ht~g in tho C~¥s ~,
~ f~ ~not ~ ~ unbl ~ T.U. ~ s~b
· e I~h~ p~ ~ ~ ~ ~L
Ofl~ ~o pl~s ~ Su~, ~2.~ ~ I~t ~ ~ ~.
(1~% due p~ to ~ ~ d ~t)
Street Sign Fees.'
Assesse~ for signage in tAe City's ~ht-of-w~y.
(See allached fee cel(~latlot~ if applicable)
N/A
N/A
N/A
N/A
N/A
N/A
Page
11:44 CITY OF COPPELL ENGINEERING ~ CITY OF ~IPPELL NO. 110 [~EI5
FEE WORKSHEEi
1/26/98
~mpect Fee:
Domestic Meter(s):
Irt/gat/on Msteris):
Car Wmh Addition, i~t 2 (CopJ~ell CommoaO
2.5
2.5
Fireline Meter(s):
Total ~: 5 ESU'$ ~ $450.00
(100% due priog to Coun~ approval of the final plat)
Water Talp Inspection Fee: :
Total I: 2 Connections · $50.00 ea.
(Single femih/due ~;or to Issuance ~f boild;~ pem~it!
{All other davulopmenta due l~ier to i~uance of meter;}
su'$
'"'-e=u's ~' - -
ESU'a
ESU's
$2.250.00
Water ~[~ter Fee (Domestic):
Total l: 1 Domestic Meter(s) @ ~57.75
(Single fsmily due prior to i~suenco of building permit)
(All other develol~ment~ du~l prior to issuance of metar~
057.75
Water Me,er Fee (]rrigation/Firdine):
Total #: 1 Irrlget/on Meter(S) 0
Total l: 0 Additional Irrig&tion Meta~{$) 0
Total #: 0 Fireline Meter(si ~
(1~ due p~or to i~n~ of wat~ ~s)
$5?.75
J
$$7.75
t0.00
$0.00
A'ater Me,er Deposit Fee (Domestic):
Total #: 1
(100% due prior to issuenCil of water me, ers)
· rigatien~Firt Meter Deposit Fee:
Total I: I Metals) @ 030.00 #.
(100% due prior to issuance of water metal)
$35.00
Impact Fee:
Total Domestic Meter~ igsLr ,,
2.S
,t. 2s..oo
Tap hspection Fee;
Total f: 1 Com~'tions ~ e50.00 ea.
(lOO%---"~ue I)tior to ieeuanc~ of building permit)
060.00
;tgit~ Final Inspection Fee (All devdopmenU):
Total I: 1 Lots O $$0.00 #~
(100% due prio~ to i~uanc0 of buiM'U~l pem~}
Page
.07 2]/98 11:44 CITY OF COPPELL ENGINEERING * CITY OF 'OPPELL NO, 110 006
ROY,U. GENERAL CONTRACTORS, INC. m,,,~u.~,~,~m .. 9551
P.O, BOX ~
COPPEII TEXA~ 7zm19