Loading...
Riverchase (6.2)-CS 980720Prep,- - Approve~ by Fax Note 7671 21~ 504 5590 CIT-Y OF COPPELL ENGINEERING ~ CITY 05 Co ]PPELL NO. 110 OPPELL ~,~J, E. NO ENTRY POSTED BY: F*'UND: ~ DATE: ~-~o~ DATE: DESCRIPTION ACCOUNT , NUMBER ~ ,, ~ ...... ~j ..'-- ~~va ,., ,,,&~ ~ ~' ~..~ /.~/ ,, ~. .... CITY OF COPPELL ENGINEERING ~ CITY OF-~OPPELL ~[~VELOPMENT FEE TABJ~ NO, 110 Project: Grand Car Wa~k Add~, Lot 1 Date: ?/20/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL kPPROYAL ~ Water Impact Fee $3,600.00 .~ $3.600.00 (100~ due prior to Council Approval) Water 'Tap Inspection Fee $~50.00 (100~ due at Issuance of Wate~ Meter) J Water Meter Fee 03ome~tic) ~/ $192.15 _(100% due at [smunce of Wa~"riMe~') Water Meter Fee ('h~isation/Fireime) $0.00 (100~ due at l.~-uance of WaterlMe~-r) Water Meter Deposit (Domestic) ,' S35.00 (t00 % due at Iss,,n-ce of Water i~eter) lrrig~tion/F~reliae Meter l~sit $0.00 (100% due at Xssunnce of Water Meter) Wa~tewater ImPact Fee $3,600.00 $3,600.00 (100~ due prior to Council Appto,,ml) Wastewater Tap Inspection Fee $50.00 Utility Final lmpection Fee $50.00 (100 · due at ls.~mnce of Buildin~ Permi0 Park Fee .$0.0~} (100% due prior, .to Council A .pl~. vai) Roa,~way Impact Fee ${J.00 $0.00 (I00% due prior to. Council Appr0vnl) ... Street Light Fee Infornmmm ~ (100 ~. due prior to Acceptance of Project av,~,,h~ at mi~ ~ Street Sign Fee Information nm ~.(.100% du.e prior to Acceptance oi~ Project ,vaitele at ~ ~ Construction Inspection Fee Ne~d ~ of tOTAL $=/,$77.15 TOTAL AMOUNT DUE PRIOR TO COUNCIL AI~ROV~ .$~ ~)? 25 98 / ,PROJECT: 11:4~ CITY OF COPPELL ENGINEERING ' CITY OF ~OPPELL r~ELOPMENT FEE WORKSHP.~I~' G..~d Cm. W'~A ~_~,~_-,~. ~ I (Copp~ Comwm) ?/~0/~ Imp.ct Fee: D~mes~c ~er(s): In~gat~n Meter(s): Fireline Meter(s): = 8 ESU'$ = ESU'. = ESU's = ESt./'. Tota~ #: 8 ESt.rs O $,4~0.00 ea. (100% du~ prior to C~uno1 approval of ~ final p~t) IYa,ter Tap Inspection Fee: Total #: I Co~nodJofls 0 LqO,00 ea. (sir~e femay due prkr to Dotaestic Water Meter Fee: Total #: I Domos~ MMm'(s) ~ $'~92.15 (Single family clue prim to isr, u~ce of building pema) (AJI o,'~r dew;opment~ clue prim to issuance of meter) lrrlgation/Fireline Water Meter Fee: Total #: 0 Ir,'igation Me~(s) ~ TO(al ~.. 0 Udit~onBI Irf~Jon Meter(s) ~ Tota~ #: 0 F'u'elble Metes) ~ '(100% due prior to iss ,Uanco of water meters) Do~z,,cstic Water Meter Deposit Fee: Tolal ~. I Meter(s) 0 (100% due prior to iss~rance of water meters) Irrigation/Fire Meter Deposit Fee: To~. 0 ~t~s) O s3o.ooea. (10o% due prior to ~,_,ance ~ water metro3) Wz~l,ewater Impact Fee.* TOMI Domestic Mete.~ ESU's: 8 WMt,ewater Tap Inspection Fee: Total ~. t GonneoUons ~ ~'k~O.O0 ea. (loo% due prkx to Muanoo of txddb~0 pem~t) Utility Find Inspection Fee (AU developmeuf~): Total #: 1 Lots 0 $50.00 0 00% due prkx to Juuance of buga~g pemdt) NO. 110 $192.15 IP~ge 1 11:44 CITY OF COPPELL ENGINEERING ~ CITY OF ~OPPELL FEE WORKS HE~I' NO, lIB Fee (For ResldenUal Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Mul~-family · $75.00 1Un~ (50% paM prior to COuncil OOI~WBI of ~rml plat) (50% paid at tssuafl~o of buMlflg pmmit) Preliminary plat approved after Jane 23, 1992: N/A N/A Preliminary plat approved after October 26, 1993: NIA Single-family ~ S1285.001 Lot N/A Mulli-family ~ $1285.00 / Unit (lOO% pay p.o~ cou~ epprov~ of fln~ pm) Roadway Impact Fee: (See atmc~ed fee cadcula~fls) SLoe,et Ligb~g Fees: Assessed for f~ht~g in tho C~¥s ~, ~ f~ ~not ~ ~ unbl ~ T.U. ~ s~b · e I~h~ p~ ~ ~ ~ ~L Ofl~ ~o pl~s ~ Su~, ~2.~ ~ I~t ~ ~ ~. (1~% due p~ to ~ ~ d ~t) Street Sign Fees.' Assesse~ for signage in tAe City's ~ht-of-w~y. (See allached fee cel(~latlot~ if applicable) N/A N/A N/A N/A N/A N/A Page 11:44 CITY OF COPPELL ENGINEERING ~ CITY OF ~IPPELL NO. 110 [~EI5 FEE WORKSHEEi 1/26/98 ~mpect Fee: Domestic Meter(s): Irt/gat/on Msteris): Car Wmh Addition, i~t 2 (CopJ~ell CommoaO 2.5 2.5 Fireline Meter(s): Total ~: 5 ESU'$ ~ $450.00 (100% due priog to Coun~ approval of the final plat) Water Talp Inspection Fee: : Total I: 2 Connections · $50.00 ea. (Single femih/due ~;or to Issuance ~f boild;~ pem~it! {All other davulopmenta due l~ier to i~uance of meter;} su'$ '"'-e=u's ~' - - ESU'a ESU's $2.250.00 Water ~[~ter Fee (Domestic): Total l: 1 Domestic Meter(s) @ ~57.75 (Single fsmily due prior to i~suenco of building permit) (All other develol~ment~ du~l prior to issuance of metar~ 057.75 Water Me,er Fee (]rrigation/Firdine): Total #: 1 Irrlget/on Meter(S) 0 Total l: 0 Additional Irrig&tion Meta~{$) 0 Total #: 0 Fireline Meter(si ~ (1~ due p~or to i~n~ of wat~ ~s) $5?.75 J $$7.75 t0.00 $0.00 A'ater Me,er Deposit Fee (Domestic): Total #: 1 (100% due prior to issuenCil of water me, ers) · rigatien~Firt Meter Deposit Fee: Total I: I Metals) @ 030.00 #. (100% due prior to issuance of water metal) $35.00 Impact Fee: Total Domestic Meter~ igsLr ,, 2.S ,t. 2s..oo Tap hspection Fee; Total f: 1 Com~'tions ~ e50.00 ea. (lOO%---"~ue I)tior to ieeuanc~ of building permit) 060.00 ;tgit~ Final Inspection Fee (All devdopmenU): Total I: 1 Lots O $$0.00 #~ (100% due prio~ to i~uanc0 of buiM'U~l pem~} Page .07 2]/98 11:44 CITY OF COPPELL ENGINEERING * CITY OF 'OPPELL NO, 110 006 ROY,U. GENERAL CONTRACTORS, INC. m,,,~u.~,~,~m .. 9551 P.O, BOX ~ COPPEII TEXA~ 7zm19