Loading...
Shadydale 1stP-CS 990915 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS Larry Davis, Construction Inspector Engineering Danny Hightower, Utilities Division Public Works September 15, 1999 Follow-up Walk-thru for Shady Dale Acres Fire hydrant blowilm at bottom - bad seal. (item//4/ Remark on street mr item//6. CITY OF COPPELL PUBLIC IFORK, V DKPARTMF~N'r MESSAGE CONF I RMAT I ON 0g×lS?g9 lZb 00 ID--CITY OR COPPELL DATE 09/15 S,R-TIME DISTANT STATION ID MODE PAGES 00'20" CITY OF COPPELL CALLING 01 RESULT OK 0000 COPPELLUTILITIES DIVISION DATE: TIME: TO: FROM: RE: August 10, 1999 8:30 a.m. Larry Davis, Construction Inspector Danny Hightower,Utilities Division Walk-thru Shady Dale Acres Listed below are Utility Division comments relative to walk thru. 1. Northeast corner valve stack, replace pad. Blue Dot in street to mark fire hydrant. oh Clean meter can below lower fittings. Need new pad on 2 F.H. on east side marked blue-face fire hydrant to street. copper line needed to cut off at corp & capped. Mark all services & fire hydrant, valves, & manhole on street. MEMORANDUM From: RE: Date: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Holloweli, Director of Public Works Greg Jones, Chief Building Official August 6, 1999 A final walk-thru for utilities and drainage on the referenced project has been scheduled for Tuesday, August 10, 1999 at 8:30 a.m. If I can be of further assistance please let me know. cc: Lee Stone, Commercial Inspector Dan Dowdey, P.E., Dowdey-Anderson (fax: 972-931-9:538) Dean Trudell, Holmes Builders (fax: 972-424-2931) .: C'Sd~):