Shadydale 1stP-CS 990915 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Larry Davis, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
September 15, 1999
Follow-up Walk-thru for Shady Dale Acres
Fire hydrant blowilm at bottom - bad seal. (item//4/
Remark on street mr item//6.
CITY OF COPPELL PUBLIC IFORK, V DKPARTMF~N'r
MESSAGE
CONF I RMAT I ON
0g×lS?g9 lZb 00
ID--CITY OR COPPELL
DATE
09/15
S,R-TIME DISTANT STATION ID MODE PAGES
00'20" CITY OF COPPELL CALLING 01
RESULT
OK 0000
COPPELLUTILITIES DIVISION
DATE:
TIME:
TO:
FROM:
RE:
August 10, 1999
8:30 a.m.
Larry Davis, Construction Inspector
Danny Hightower,Utilities Division
Walk-thru Shady Dale Acres
Listed below are Utility Division comments relative to walk thru.
1. Northeast corner valve stack, replace pad.
Blue Dot in street to mark fire hydrant.
oh
Clean meter can below lower fittings.
Need new pad on 2 F.H. on east side marked blue-face fire
hydrant to street.
copper line needed to cut off at corp & capped.
Mark all services & fire hydrant, valves, & manhole on street.
MEMORANDUM
From:
RE:
Date:
Mike Martin, Asst. City Engineer
Doug Stevens, Engineering Technician
Glenn Holloweli, Director of Public Works
Greg Jones, Chief Building Official
August 6, 1999
A final walk-thru for utilities and drainage on the referenced project has been scheduled
for Tuesday, August 10, 1999 at 8:30 a.m.
If I can be of further assistance please let me know.
cc: Lee Stone, Commercial Inspector
Dan Dowdey, P.E., Dowdey-Anderson
(fax: 972-931-9:538)
Dean Trudell, Holmes Builders
(fax: 972-424-2931)
.:
C'Sd~):