Loading...
Shadydale 1stP-CS 990305The City With A Beautiful Future RO BOX 478 COPPELL, TEXAS 75019 Dan M. Dowdey, P.E. Dowdey, Anderson and Associates 5225 Village Creek Drive, Suite 200 Piano, Texas 75093 Shadydale Acres Development Fee Assessment P.O. Box 478 Coppell, Texas 75019 972-462-0022 F~ 24, 1999 Dear Mr. Dowdey: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of ~ and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Kenneth M. P.E. Director of Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glean I~Ioll~ell, Assistant Director of Public Works Greg Jones, Chief Building Offficial Gary Sims, Director of Leisure Services Project: Date: DEVELOPMENT FEE TABLE Shadydale Acres 3/5/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,400.00 $5,400.00 (100% due prior to Council Approval) Water Tap Inspection Fee $600.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $297.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigatioa/Fireline) $0.00 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $420.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $5,400.00 $5,400.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $600.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $600.00 (100% due at Issuance of Building Permit) Park Fee $16,705.00 $16,705.00 (100% due prior to Council Approval) Roadway Impact Fee $I 1,115.00 $11,115.00 (100% due prior to Council Approval) Street Light Fee $0.00 (100% due prior to Acceptance of Project Street Sign Fee $0.00 (100% due prior to Acceptance of Project Construction Inspection Fee $0.00 tOTAL $41,137.96 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $38,620.00 DEVELOPMENT FEE WORKSHEET PROJECT: Shadydele Acres DATE: 3/5/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 12-~8inchX3/4inch = 12 ESU's 0 = 0 ESU~ 0 = 0 ESU~ 0 = 0 ESU% Total #: 12 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 12 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: 12 Domestic Meter(s) @ $24.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0: 12 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. ( 100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 12 @ $450,00 ea. Wastewater Tap Inspection Fee: Total #: 12 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 12 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $5,400.00 $600.00 $297.96 $0.00 $0.00 $420.00 $0.00 $5,40O.OO $600.00 $600.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 13 Single-family ~ $1,285.00 per lot 0 Multi-family ~ $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Zone 1 $16,705.00 $0.00 $2,184.0CI, N/A Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A P~e2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Shadydal~ Acres DATE: $151~9 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Sin$1e-F~mil}, De~ached Development Units ** 13 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $11,115.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. The City With A Beautiful Future PO 80X 478 COPP£LL. TEXAS 75019 Box 478 Coppell, Texas 75019 972-462-0022 Dan M. Dowdey, P.E. Dowdey, Anderson and Associates $22.~ Village Creek Drive, Suite 200 Piano, Texas 75093 Shadydale Acres Development Fee Assessment February 24, 1999 Dear Mr. Dowdey: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $39,520.00 and forward to the Finance Depat~ent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Kenneth M.~ri~, ~.E. Director of Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Shadydale Acres Date: 2/24/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Water Tap Inspection Fee $650.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $322.79 (100% due at Issuance of Water Meter) Water Meter Fee (h-rigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $455.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $650.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $650.00 (100% due at Issuance of Building Permit) Park Fee $16,705.00 $16,705.00 (100% due prior to Council Approval) Roadway Impact Fee $I 1,115.00 $11,115.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contxacts tOTAL $42,247.79 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $39,520.00 DEVELOPMENT FEE WORKSHEET PROJECT: Shadyda~e Acres DATE: 2/24/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 13 - 5/8 inch X 3/4 inch = 13 ESU~ = ESU's = ESU's = ESU~ Total #: 13 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 13 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 13 Domestic Meter(s) ~ $24.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/FireHne Water Meter Fee: Total 0: 0 Irrigation Meter(s) @ Total #: 0 Additional In*igation Meter(s) @ Total #: 0 Fireline Meter(s) ~ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 13 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigafioa/Fire Meter Deposit Fee: Total #: 0 Meter(s) ~ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 13 ~ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 13 Connections ~ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 13 Lots ~ $50.00 ea. (100% due prior to issuance of building permit) $5,850.00 $650.00 $322,79 $0.00 $0.00 $455.00 $5,850.00 $650.00 $650.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23,1992: N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Prel~mlnary plat approved after October 26, 1993: 13 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. ( 100% due prior to final acceptance of development) N/A N/A N/A N/A $16,705.00 N/A $11,115.00 Information not available at ahis ~ Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need subtniual of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: $1mdydal~ Acres DATE: 2/24/99 ROADWAY IMPACT Service Area * 1 Category ** Residential Land Use ** Siagle-Fnmily Detached Building Size (Sq. Ft.) N/A Development Units ** 13 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Develo[~ment Unit) x (Fee per Vehicle Mile) = $11,115.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)