Loading...
Riverchase (4)-PT 931012Bore/Excavation in Public Right-Of-Way Permit City of Coppei1 - Public Works Department Representing: ~ / Have ,~1 City and/or Franchise Utiliti~ Con~acted and Existing Utilities Located: Q_ YE~ NO Will It Be Necess~~avate Street, ~ley or Sidewalk Payment? ~~tach~/' ps,it) ,~N~ /~ Representative(s) ~f the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas ~nual on Unifo~ Traffic Control Devices. ~ea(s) affected must be restored to as good condition as before the co~encement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works DeparTments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or applicable. Franchise/C~ntractor Represen~ive street closure is Date Franchise Inspecuor/or City Inspector Date Applicant shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of action that may be made or come against it by reason of or if any way arising ou~ of the closure, blocking, excavating, cutting, ~unnelinq, or other work by the applicant under permit from the City, if such permit is granted. P EP~MIT. PIIB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NO WET BORES ALLOWED!