Loading...
Riverchase (6.1)-CS 970424The City With A Beautiful Future P.O. Box 478 ~, Tex~ 75019 214-482-0~2 Bill Dickson, AIA ROFDW Architects 703 Mrglnney, Suite 401 Dallas, TX 75202 Replat of Blverc)~ ~-~, Phase 1, Lo~s B & C and Lot D, RivaxJume Plaza, Ptume 1 (Grand Car Wash) Devdopmmt Fee Assesan~t Dear Mr Dickson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of CoppeU in thc amount of $32,009.92 and forward to the Finance Depatbagnt along with a copy of thc Fee Asse~nent table. This amount is a lx~ion of the assessed fees which need to be paid prior to Council approval. Please refer to *~ne-bed table for additional fees. Also provide a copy of thc Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of requi~d fees ami ~ a successful beghming of this project. We look forward. to working with you on this project. If you have any questions, please coniact me. Sincerely, Kenneth M. Griffin, P.E. Di~ctor of Engineering & Public Works Jennif~ Armstrong, Finance Director Doug Stevens, F_~imering Teclmici~ Greg Iones, Chief Building Official ~ $1rns, Dh'. Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: DATE: R~plat of Riverchase Plaza, Phase 1, Lots B & C and Lot D, Ri~erchaze Plaza, Pha~e I (Grand Car Wash) 4/24/97 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 ESU's I - I 1/2 inch = 5 ESU's Irrigation Meter(s): 1 - I 1/2 inch = 5 ESU's Fireline Meter(s): 0 - N/A = ESU's Total #: 18 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) $8,100.00 $150.00 $195.98 $144.38 $144.38 $0.00 $60.00 $35.00 Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: I Domestic Meter{s) @ $195.98 I Domestic Meter{s) @ $144.38 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Additional irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $144.38 Water Meter Deposit Fee (Domestic): Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 13 @$450.00 ea. $5,850.00 Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) $50.00 Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminnry plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Ligbtin~ Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A t~ 18,059.92 available at this time Street Si~n Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submiltal of development contracts Page 2 DEVELOPMENT FEE TABLE Date: Replat of Riverchase Plaza, Phase 1, Lots B & C and Lot D, Riverchase Plaza, Phase 1 (Grand Car Wash) 4/24/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,100.00 $8,100.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $340.36 (100% due at Issuance of Water Meter) Water Meter Fee (Lrrigation~Fireline) $144.38 (100% due at Is~mnce of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permi0 Utility Final Inspection Fee $100.00 (100% due at Issuance of Buildin~ Permi0 Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $18,059.92 $18,059.92 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee ~e~l submittal of TOTAL $32,889.66 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $32,009.92 ROAD VAY IMPACT FEE CALCULATIONS PROJECT: DATE: Rq~lat of Rivtrelutte Plaza, Plmse 1, Lots B & C attd Lot D, Riwrcltase Plarlt, Pltase I (Grand Car WatlO 4/24/97 ROADWAY IMPACT FEE: Ca~$ory ** T~nd US~ ** Development Units ** Vehicle Miles per Develolmlent Ullit ** Fee per Vehicle Mile *** Roadway Impact 1~ d~ = 0~v~l,,~u~t Units) x (?abi¢le Miles per Dewlc~me~ Unit~ x ~ee per Vehicle Mile) = 7 Commerei~ Others / No{ $[~ecifi~d {Commercial} 12,647 + 12.647 4.76 $3O0 $18,059.92 + Incl,_,4~ Sq. Ft. ofboth BuiMin~ * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)