Loading...
Riverchase (6.1)-CS 940927Spring Valley Conatructlon Company September 27, 1994 CITY OF COPPELL Engineering Department 255 Parkway Blvd. Coppell, Texas 75019 Attn: Larry Davis Re: Riverchase Plaza Retail Coppell, Texas Dear Mr. Davis: Please find enclosed a check in the amount of St 20.00 for the Erosion Control Maintenance Bond on the above referenced project. This amount represents 100% of the value of this work at the drainage swales fqr, eme'y'~ ar. Feel tree to call if I can be of further help. Sincerely, SPRING VALLEY CONSTRUCTION COMPANY Tim Guedry Project Engineer TG/csa Enclosure cc: Fehmi Karahan Mike Gray 9401 1.7 16475 Dallas Parkway, Suite 620, Dallas, Texas 75248-2670, 214/931-8600, Fax 214/380-9085 Spring Valley Construction Company 16475 Dallas Pail<way, Suite 620, Dallas, Texas 75248 Date Pay to the order of: EQUITABLE BANK, Dallas, Tx 75240 Check No. ,,Oi, Spci?#, ,:I,l.I, OO?Ci]l~,: ODt, ~S O#' 001 529 Amount 'IL1; ( ). OO Spring Valley Construction Company Opiating Aocount ~ Do,., 9-~* ,~W 0023725 Address Dollars $ IJ~ c~ IIIIII