Loading...
Riverchase (6.1)-CS 940923COPPELL PUBLTC WORKS MEMORANDUM DATE: TO: FROM: RE: September 23, 1994 Larry Davis, Construction Inspector Howard Pafford, Water Utiliti Follow Up Walk-Through on chase Plaza (Water/Sanitary Sewer) A follow up walk-thru was conducted on the above referenced project and all punchlist items previously noted had been corrected. HLP/hlp