Loading...
Shadowrdg-CS 900910COPpEr. r. PUBliC WORI~ September 10, 1990 Steven G. Goram, Director of Public Works Per Birdsall, Street Superintendent~ Shadowridge Drainage Channel Tickler 9-14-90 The Shadowridge channel has been under observation for a considerable time. The grasses in the channel are being maintained or should be maintained by the property owner. The easement is on the plat within the property lines. It is the nature of drainage channels to build up a considerable amount of eroded material and subsequent growth of vegetation during development of adjacent and surrounding properties as was experienced in both the Woodridge and Parkwood Channels. I proposed some months ago to address the build up of eroded materials, with the rental of a skid steer loader, which would enable us to address the situation. The material would then be used to fill in an eroded area of the channel which is addressed with a proposed solution in the Albert Halff Drainage Study. Due to the constantly wet conditions in the concrete flume which lines the channel, this project will take a considerable number of man hours to complete. I was expecting to be able to begin this earlier this summer but unusually wet conditions, and projects, such as the extension of the storm sewer pipe in the Anderson Pocket Park, we have only but recently been able to keep up with vegetation growth around the City. The current condition has little affect as it pertains to the channels hydraulic capacity whereby creating no concerns for flooding. I will be scheduling this activity to begin within the next month given reasonable working conditions (weather). Status 10-12-90 p~/mp