Loading...
Shadydale Lot 2C-CS021212December 12, 2002 David Reid, P.E. Dowdey-Anderson & Assoc. 5225 Village Creek Dr, Suite 200 Piano, Texas 75093 Smart O'Neal Office Building Final Acceptance Dear David: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Sincerely. Larry /)' [/D~fvis '- l Construction Inspector CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn HolloweD, Asst. Dir,ecto.r of ~blic Wor~ Greg Jones, Chief Building Official Travis Crump, Fire Marshal