Shadydale Lot 2C-CS021212December 12, 2002
David Reid, P.E.
Dowdey-Anderson & Assoc.
5225 Village Creek Dr, Suite 200
Piano, Texas 75093
Smart O'Neal Office Building
Final Acceptance
Dear David:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
Sincerely.
Larry /)' [/D~fvis '- l
Construction Inspector
CC:
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn HolloweD, Asst. Dir,ecto.r of ~blic Wor~
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal