Loading...
Riverchase (6.1)-CS 940318 (2)~he City With A Beautiful Future March 18, 1994 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Fehmi Karahan, General Partner Riverchase pla~ Ltd. 5429 LBJ Freeway, Suite 340 Dallas, Texas 75240 RE: Riverchase Plaza Development Fee Assessment Dear Mr. Karahan: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Riverchase Plaza. Please provide a cheek made payable to the City of Coppell in the amount of $15,300.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: March 18,1994 Riverchase Plaza TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,700.00 $11,700.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 400.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 3,600.00 $ 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 300.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $189.10 (100% due at Issuance of Building Permit) Water Meter Deposit (Non-residential) $140.00 -O- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 5,014.90 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * -0- -0- (100% due prior to Acceptance of Project) Park Fee -0- -0- (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 21,344.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $15,300.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. WORKS HEHO~JXIN March 18, 1994 Engineering Department Public Works St~ff~ Revieed~evelopment Fees for Riverchase Plaza The following revised feea should be above teleran=ed project. assessed and collected on The - ~, Domestic He~er/s - 6. ESU'z - 1~" Irrigation Meter/~ - $ ESU'm - 8# Fireline Meter/a - ~i ESU'H Total 18 ESU's ~ $650.00 ma ~ ~ 100% due prior to Council approval of the final plaT. Total (HUD) Domestic Heter/a EEKJ,a ~ $225.00 100% due prior to Council approval of final ~laC. Wa~tewmterXmpect (city) ---i__ - ~~. Domesti= Heter/~ = Total ~ ESU's ESU'~ ~ $450.00 e~ - . $3,i6oo.oo 100% due prior to Council approval of the final plaC. Water ~ Xns~m~tion Fee 4 Connections @ $I00.00 each - $ 400.00~ 100% due prior to issuance of buildtng permlC for residential. (or in the ~aae of multi-family, commercial, retail, lndustriaI~ fee is due prior to issuance of m~ter). ,,, Conne~tion~ ~ $100.00 each due ~rior to issuance of building permit. (Residential only) Utlltty Finml ~n~Cton Fee (fill Development) 100% ~ ~ior Co i~uan~e of building ~rmie. ~e~t~r Fee (Domestic) ,, I -. 2" Domemttc/Ftrs Meters 100% due prior to issuance of building permt~ for residential only. All other development fees are duo ~ior to ~smuance of mster/s. Water Water Fee (Zrrl~s~ion/Ftr~lins) 1 - __-AL Irrigation Meter/8 2 - ~" Fireline MeCer/s ~ 100% due prior to issuance of water Water Water Deposit (Residential) Meters ~ $30.00 es. - $ 100% due prior to ts=uan~e of building permi~. W~ter ~ter Deposit (Wulti-F~mily or ~on-Reside~tiel) 100% due ~tor to issu~n=e of w~r meters. ~rrl~etton Water Deposit Waters $ ~ - 100% due prior to issuance of water ~eters.