Riverchase (6.1)-CS 940304COPPELL PUBLIC WORKS
DATE
TO'.
FRO~
RE:
The following fees
referenced project.
March 4, 1994
Engineering Department
Public Works Staf_~_. ~~
Development Fees ,~rchase P~
should be assessed and collected
Water Impact Fee:
Total 35
Domestic Meter/s = 25 ESU's
Irrigation Meter/s = 5 ESU's
Fireline Meter/s = 5 ESU's
ESU's ~ $650.00 ea = S 22,750.00
100% due prior to Council approval of the final plat.
on the above
Wastewater Impact
Total
(~UD)
Domestic Meter/s =
ESU's ~ $225.00 ea =
100% due prior to Council approval
ESU's
$
of final plat.
Wastewater Impact (city)
1 - 4" Domestic Meter/s = 25 ESU's
Total 25 ESU's ~ $450.00 ea = $11,250.00
100% due-priOr to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Develop~*~nt Fees
Page 2
Sewer Tap I~pection Fee
Connections @ $100.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Utility Final Inspection Fee (All Development)
4 lots ~ $50.00/lot = $ 200.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
2 - 8" x 4" Domestic/Fire Meters @ 5,572.28 ea = $31,144.56
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
~ - 1~" Irrigation Meter/s ~ $ 210.70 ea =
__ - Fireline Meter/s @ $ ea = $
100% due prior to issuance of water meter/s.
$210.70
Water Meter Deposit (Residential)
3 Meters @ $30.00 ea = $ 105.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters ~ S35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters ~ $35.00 ea = $
100% due prior to issuance of water meters.