Loading...
Riverchase (6.1)-CS 940304COPPELL PUBLIC WORKS DATE TO'. FRO~ RE: The following fees referenced project. March 4, 1994 Engineering Department Public Works Staf_~_. ~~ Development Fees ,~rchase P~ should be assessed and collected Water Impact Fee: Total 35 Domestic Meter/s = 25 ESU's Irrigation Meter/s = 5 ESU's Fireline Meter/s = 5 ESU's ESU's ~ $650.00 ea = S 22,750.00 100% due prior to Council approval of the final plat. on the above Wastewater Impact Total (~UD) Domestic Meter/s = ESU's ~ $225.00 ea = 100% due prior to Council approval ESU's $ of final plat. Wastewater Impact (city) 1 - 4" Domestic Meter/s = 25 ESU's Total 25 ESU's ~ $450.00 ea = $11,250.00 100% due-priOr to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Develop~*~nt Fees Page 2 Sewer Tap I~pection Fee Connections @ $100.00 each = $ 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (All Development) 4 lots ~ $50.00/lot = $ 200.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 2 - 8" x 4" Domestic/Fire Meters @ 5,572.28 ea = $31,144.56 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) ~ - 1~" Irrigation Meter/s ~ $ 210.70 ea = __ - Fireline Meter/s @ $ ea = $ 100% due prior to issuance of water meter/s. $210.70 Water Meter Deposit (Residential) 3 Meters @ $30.00 ea = $ 105.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) Meters ~ S35.00 ea = $ 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters ~ $35.00 ea = $ 100% due prior to issuance of water meters.