Shadydale Lot 2C-CS010309DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIGINATION DATE:
SENT
3/9/01
3/9/01
-~%&4%
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
Stuart O'Neal Office Building (Shadydale Acres Lot 2C)
3/9/01
ASSESSED FEE
AMOUNT PAID DATE
$3,375.00 $3,375.00 3/9/01
$1,125.00 $1,125.00 3/9/01
noti~ street dept.
$1,181.44 $1,181.44 3/9/01
$5,314.68 $5,314.68 3/9/01
$150.00 $50.00 2/15/97
$50.00
$82.74
$2,240.12 $2,157.38 2/15/97
$35.0O
$60.00 $30.00 2/15/97
$50.00
Total Fees Fees Paid Amount Owed
$13,663.98 $13,233.50 $430.48
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.