Loading...
Shadydale Lot 2C-CS010309DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINATION DATE: SENT 3/9/01 3/9/01 -~%&4% ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Stuart O'Neal Office Building (Shadydale Acres Lot 2C) 3/9/01 ASSESSED FEE AMOUNT PAID DATE $3,375.00 $3,375.00 3/9/01 $1,125.00 $1,125.00 3/9/01 noti~ street dept. $1,181.44 $1,181.44 3/9/01 $5,314.68 $5,314.68 3/9/01 $150.00 $50.00 2/15/97 $50.00 $82.74 $2,240.12 $2,157.38 2/15/97 $35.0O $60.00 $30.00 2/15/97 $50.00 Total Fees Fees Paid Amount Owed $13,663.98 $13,233.50 $430.48 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.