Loading...
Shadowrdg-CS 900112COPPELL PUBLIC WORKS January 12, 1990 Steve Goram, Director of Public Works Per Birdsall, Street Superintendent~ Shadow Ridge Channel Tickler 1/9/90 The conditions represented in my previous memo are how they exist currently. The pilot channel will require a one time cleaning given that the property owner establishes and maintains grasses on the banks. The job will require two phases given the constantly wet conditions that currently exist. The first phase will require the rental of the skid steer loader to remove the dirt from the pilot channel. The second phase would occur after some drying time was allowed for the banks, which could then be dressed with existing equipment. PHS/bb SRIDGE.PHB