Loading...
Denton Tap 1A-LR051208ECS - Texas~ LLP 4950 Keller Springs Road,Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392-0102 December 8, 2005 Little Diversified Arch. Consulting 5001 Spring Valley Road, Suite 282~W Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse LETTER OF TRANSMITTAL RE: Wachovia - Coppell ECS Job tl 19:4236-A Permits: Location: We are enclosing: X Materials Engineering Division Reports X For your use As requested CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. Ritchie City of Coppell - Lee Stone City ofCoppell - Larry Davis Little Diversified Arch. Consulting - Jaime Nenclares ENCL: Field Report # 26 12/06/2005 Daniel Franklin, P.E. President/Principal Engineer ~5onstruction Services Manager ECS - Texas, LLP 4950 Keller Sprln~ Road, Suit~ 480 Addison, TX 75001 (972) 3923222 (FAX) 392-0102 Project Wachovia - Coppell Location Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud BoRon Remarks Tdp Charges* Chargeable Items Tolls/Parking* Mileage* 40 FIELD REPORT Project No. 19:4236-A Report No. 26 Day & Date Tuesday 12/06/2005 Weather 45°/Sunny On-Site Time 1.00 Lab Time 0.25 Travel Time* 1.00 Total 2.25 Re Obs.'~me 0.00 Time of Arrival Departure 09:30A 10:30A * Travel time and mileage will be billed in accordance with the contract Summary of Services Pe~formad (field test data, Iocalona, ele~fiona & depths am estimale$) & Individuals Contacted. Concrete Placement Observation: The undersigned arrived on site, as requested, to observe the placement of 20 cubic yards of 3500 psi concrete for drive thru islands and sidewalk. Prior to the placement of concrete, reinforcing steel was observed and appeared to be placed in accordance with project drawings and specifications. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. 1 set of 5 cylinders was cast for compressive strength testing in our laboratory. By John Zimont, -- Field Technician 1800 71388