Denton Tap 1A-LR051208ECS - Texas~ LLP
4950 Keller Springs Road,Suite 480
Addison, TX 75001
(972) 392-3222
(FAX) 392-0102
December 8, 2005
Little Diversified Arch. Consulting
5001 Spring Valley Road, Suite 282~W
Providence Towers
Dallas, TX 75244
ATTN: Ms. Kathryn E. Rabuse
LETTER OF TRANSMITTAL
RE: Wachovia - Coppell
ECS Job tl 19:4236-A
Permits:
Location:
We are enclosing: X Materials Engineering Division Reports
X For your use
As requested
CC: Centex Construction Co. - Claud Bolton
Centex Construction Co. - Robert Boe
Wachovia Corporate Real Estate - Ken Clausen
Little Diversified Arch. Consultants - Philip F. Ritchie
City of Coppell - Lee Stone
City ofCoppell - Larry Davis
Little Diversified Arch. Consulting - Jaime Nenclares
ENCL:
Field Report # 26 12/06/2005
Daniel Franklin, P.E.
President/Principal Engineer
~5onstruction Services Manager
ECS - Texas, LLP
4950 Keller Sprln~ Road, Suit~ 480
Addison, TX 75001
(972) 3923222
(FAX) 392-0102
Project Wachovia - Coppell
Location Coppell, TX
Client Little Diversified Arch. Consulting - Kathryn E. Rabuse
Contractor Centex Construction Co. - Claud BoRon
Remarks
Tdp Charges*
Chargeable Items
Tolls/Parking* Mileage* 40
FIELD REPORT
Project No. 19:4236-A
Report No. 26
Day & Date Tuesday 12/06/2005
Weather 45°/Sunny
On-Site Time 1.00
Lab Time 0.25
Travel Time* 1.00
Total 2.25
Re Obs.'~me 0.00
Time of Arrival Departure
09:30A 10:30A
* Travel time and mileage will be billed in accordance with the contract
Summary of Services Pe~formad (field test data, Iocalona, ele~fiona & depths am estimale$) & Individuals Contacted.
Concrete Placement Observation:
The undersigned arrived on site, as requested, to observe the placement of 20 cubic yards of
3500 psi concrete for drive thru islands and sidewalk.
Prior to the placement of concrete, reinforcing steel was observed and appeared to be placed in
accordance with project drawings and specifications.
Concrete observed on this date appeared to be placed in compliance with project specifications
with regard to temperature, slump, air content, and batch to placement time.
1 set of 5 cylinders was cast for compressive strength testing in our laboratory.
By John Zimont, -- Field Technician