Loading...
Park West CC(02-2)-LR051207CONCRETE CYLIN~ORT Park We~s~mmerce Center ~"/ Beltl~ij~Road and Airline Road .7...- ~' Coppell, Texas ! PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer REPORT NO. 147 REG PROJECT NO. 12468 SAMPLE DATE: 11-09-05 TECHNICIAN: M. Wood PAGE: 1 of 1 CONTRACTOR: Cadence McShane Corporation Location of Sample 1'~- ) ~' Set Number I Location ~resented 1 Approach: 80'N, 30'W from Airline Dr. Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 8205 4000 Test Results Set Cylinder Age @ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 5816 11-16-05 7 89530 3170 5816 12-07-05 28 119060 4210 5816 12-07-05 28 124160 4390 4300 5816 Hold H Cylinder Data Set Cylinder Time of Concrete Air Ticket N1o. ID Slump Sample Air Temp. Temp. Entrainment Number 5816 5.5 12:1 OPM 84 88 NA 152774 Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. 2424STUTZ DR. · SUITE400 · DALLAS, TX 75235 * TEL [214] 3505600" FAX [214] 3500019 EEO I E I--I I r-'lira- I=111--1 GEOTECHNICALAND ~ J~J r~ I I jc=:J ENVIP, ONHENTAL CONSULTANTS REPORT OF REINFO~O~O_~,,~NG STEEL PLACE~j~SERVATION Par~lAl~"t Commerce_ Center ~line Road and Airline Road REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer CONTRACTOR: Cadence McShane Corporation REPORT NO. 149 REPORT DATE: 12-07-05 REG PROJECT NO. 12468 DATE OBSERVED: 11-16-05 TECHNICIAN: M. Wood PAGE: 1 of 1 Items Observed: J Paving: 100-240'S, 0-25'E and 300-440'S, 0-25'E from S.E. corner of Building A. Paving: 50-200'S, 0-25'W from N.W. corner of Building A. Reference Plans or Notes Used: I Sheet C5.1 J~-~JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore  tewart Consulting Associates/ j ~.1 q~ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · IEL [214] 350 5600 * FAX [214] 3500019