Park West CC(02-2)-LR051202r~ I/ ~' / i ~'/ Bel~lfne Road and Airline Road
~i I'~/ 4" ! I/ / Coppell, Texas
~'~'~ // PO #5126-0103P
!
REPORTED TO: ~:adence McShane Corporation REPORT NO. 134
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number [ Location
REG PROJECT NO. 12466
SAMPLE DATE: 11-04-05
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 2
Quantity Represented
1
2
3
4
5
6
7
8
Paving: 185'S, 20'E of NE corner of Bldg. B 40/800
Paving: 200'S, 25'W of NW corner of Bldg. A 140/800
Paving: 250'S, 100'E of NE corner of Bldg. B 220/800
Paving: 300'S, 150'E of NE corner of Bldg. B 310/800
Paving: 475'S, 200'E of NE corner of Bldg. B 410/800
Paving: 500'S, 175'E of NE corner of Bldg. B 510/800
Paving: 550'S, 205'E of NE corner of Bldg. B 610/800
Paving: 600'S, 105'E of NE corner of Bldg. B 710/800
Desitin Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Osbum 40A55 4000
Test Results
Set Cylinder Age @ Total Load
No. ID Date Tested Test lbs.
1 5670 11-11-05 7 107330
5670 12-02-05 28 157400
5670 12-02-05 28 155110
5670 Hold H
Compressive Average
Strength p.s.i. Strength p.s.i.
3800
5570
5490 5530
2 5671 11-11-05 7 129940 4600
5671 12-02-05 28 168210 5950
5671 12-02-05 28 165110 5840 5900
5671 Hold H
3 5672 11-11-05 7 99870 3530
5672 12-02-05 28 147870 5230
5672 12-02-05 28 145110 5140 5190
5672 Hold H
4 5673 11-11-05 7 82430 2920
5673 12-02-05 28 144540 5120
5673 12-02-05 28 141770 5020 5070
5673 Hold H
2424STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214] 3500019
REPORT NO. 134
REG PROJECT NO. 12468
SAMPLE DATE: 11-04-05
PAGE: 2 of 2
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
5 5674 11-11-05 7 107140 3790
5674 12-02-05 28 150510 5330
5674 12-02-05 28 154870 5480 5410
5674 Hold H
6 5675 11-11-05 7 148900 5270
5675 12-02-05 28 177310 6280
5675 12-02-05 28 171540 6070
5675 Hold H
7 5676 11-11-05 7 115370 4080
5676 12-02-05 28 162110 5740
5676 12-02-05 28 160370 5680
5676 Hold H
8 5677 11-11-05 7 132540 4690
5677 12-02-05 28 180260 6380
5677 12-02-05 28 174130 6160
5677 Hold H
6180
5710
6270
Cylinder Data
Set Cylinder Time of Concrete Air Ticket
No. D Slump Sample Air Temp. Temp. Entrainment Number
1 5670 5.0 6:15AM 59 64 4.3 12534
2 5671 5.0 7:35AM 60 70 4.5 12535
3 5672 5.0 8:40AM 65 73 4.5 12536
4 5673 4.0 10:00AM 70 74 4.8 12537
5 5674 4.0 11:20AM 74 76 4.5 12538
6 5675 4.0 12:45PM 78 83 5.0 12539
7 5676 5.0 2:00PM 80 85 5.0 12540
8 5677 4.5 3:15PM 83 88 5.0 12542
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Parer
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Arthur Etherly, III
Manager, CMT
AE/Inc