Loading...
ST9905DR-CN051213Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com November 22, 2005 EXHIBIT "B" Ms. Suzan C. Taylor C.I.P. Coordinator The City of Coppell P. O. Box 9478 Coppell, Texas 75019 Via Fax: 972-304-3673 RE: Proposal No. 251105 Construction Materials Testing Bethel Road I Drainage Project - Phase A ST 99-05 Coppell, Texas Dear Ms. Taylor: In accordance with your request, we are pleased to submit the following proposal for materials testing and observation services for the above referenced project. Types of services are based on your letter dated November 2, 2005 and our conversation with Mr. Garreth Campbell on November 21, 2005. We estimate the fees will be as follows: LABORATORY TESTING Moisture Density Relationship 2 tests @ $175.00 per test .......................... $350.00 Atterberg Limits Test 2 tests @ $50.00 per test ........................... $100.00 Percent Material Finer than No. 200 Sieve 2 tests @ $26.00 per test ............................ $52.00 Total Laboratory Testing ........................... $502.00 The City of Coppell November 22, 2005 II. FIELD TESTING AND OBSERVATION Earthwork Testing Sampling Subgrade Soils 2 Hrs. @ $41.00 per hour ........................... $82.00 In-Place Moisture Density Tests (Based on 15 densities for Box Culvets, 12 for Gabian Sides 3 for Water Lines and 6 for Sanitary) 36 tests @ $39.00 per test ......................... $1,404.00 Trip Charges 13 trips @ $26.00 per trip (4 hours or less) ............... $338.00 Total of Field Earthwork Testing ..................... $1,824.00 Portland Cement Concrete Testing Periodic Observation of Concrete Placement (Based on 19 concrete placements) (one every 40', Slab, Walls, Roof and Manhole) 76 Hrs @ $41.00 per hour ........................ $3,116.00 Compressive Strength Concrete Cylinders (with Observation) (Based on 19 sets of 4 cylinders per day) 76 tests @ $21.00 per test ......................... $1,596.00 Trip Charges 19 trips @ $26.00 per trip (4 hours or less) ............... $494.00 Total of Concrete Testing .......................... $5,206.00 Total of Field Earthwork and Concrete Testing ............ $7,030.00 TOTAL OF ALL OBSERVATION AND TESTING SERVICES . . . $7,532.00 Based on the assumptions our total estimated fee to perform the aforementioned tests and services is $7,532.00. It should be noted that this proposal is based on the estimated number of tests and quantities mentioned in this proposal and not a lump sum price. The construction sequence or job conditions may require more or fewer testing or observation. Only work which is actually performed will be charged for and all charges will be in accordance with the corresponding unit fees quoted in this proposal or our Schedule of Fees. Texas CMT, Inc. Proposal No. 250403 Page 2 The City of Coppell November 22, 2005 We understand we have been selected for this project and therefore, when providing this estimate, we are not in violation of the engineering laws governing procurement of professional engineering contract~ with public entities. If this proposal is acceptable to you, please sign the enclosed copy, along with the Agreement for Materials Engineering and Related Construction Observation and Materials Testing Services, and mail it to us at your earliest convenience. We trust the information provided herein is sufficient for your use. Should you have any comments and/or questions, please do not hesitate to contact us. We are looking forward to working with you. Sincerely, Texas CMT, Inc. Alex Sarmiento, B.S.C.E. Project Manager Construction Materials Engineering Division Richard W. Gee, P.E. President AS:RWG/dwe Enclosure Texas CMT, Inc. Proposal No. 250403 Page 3 AGREEMENT FOR MATERIALS ENGINEERING AND RELATED CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES THIS AGREEMENT is by and between: Ms. Suzan C. Taylor C.I.P. Coordinatort The City of Coppell P. O. Box 9478 Coppell, Texas 75019 hereinafter called CLIENT and Texas CMT, Inc., a Texas corporation, hereinafter called Texas CMT, who agree as follows: 1. DECLARATIONS. CLIENT desires to engage Texas CMT to provide Materials Engineering and related construction observation and materials testing services in connection with CLIENT's project ("THE PROJECT") described as follows: Construction Materials Testinq Bethel Road I Drainaqe Project - Phase A ST 99-05 CopDell, Texas Texas CMT has submitted a fee schedule to CLIENT, a copy of which is attached hereto and made a part hereof as Exhibit "A', for Materials Engineering and related construction observation and materials testing services, which fee schedule is acceptable to CLIENT. CLIENT By: Title: ~A~tv Manager TO BE COMPLETED BY CLIENT FOR PAYMENT OF SERVICES: Firm: City of Coppell SCOPE OF WORK. Texas CMT shall provide Materials Engineering and related construction observation and materials testing services for THE PROJECT in accordance with the accompanying proposal "scope of services" made a part hereof as Exhibit B and the "terms and conditions" set forth on the back of and made a part of this Agreemem. ,2001 Title: President Date: I~/~,f,~ Address: PO R~x qATR City an.n?,l 1 , State Attention: Invoice to the Account of: Title: Zip Code: 7%fll q Phone No, 977-~&-~RTq FOR APPROVAL OF INVOICE(S): If the invoice is to be mailed for approval to someone other than the account charged, please indicate where to mail the invoice in the space below. Firm: Address: Zip Code: __ Phone No. Attention: Title: PERSON OR FIRM TO ACT AS CLIENT'S REPRESENTATIVE WITH RESPECT TO Texas CMT'S SERVICES Client's Representative: Person or firm authorized to schedule observation and testing:. PERSONS OR FIRMS AUTHORIZED TO RECEIVE COPIES OF Texas CMT'S OBSERVATION AND TEST REPORTS: RELATED CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES ARF~CLE 1 SERVICES: Texas CMT will: 1. I Act for CLIENT in a professional manner, using that degree of care and skill ordinarily exercised by and consistent with the standards of the profession practicing in the same or similar locality of THE PROJECT site. 1 .'-, Provide only those services that, in the opinion of Texas CMT, lie within the technical and professional areas of expertise of Texas CMT and which Texas CMT is adequately staffed and equipped to perform. 1.3 Perform all technical services under the general direction of a Registered Professional Engineer and in substantial accordance with the basic re- quirements of the appropriate Standards of The American Society for Testing and Materials, where applicable, or other standards designated by CLIENT. 1 ,I Promptly submit formal reports of all tests, inspections and services per- formed indicating where applicable, compliance with THE PROJECT specifications or other contract documents, Such reports shall be complete and factual, citing the tests performed, methods employed, values obtained, parts of the structure or PROJECT area involved. 1.5 Employ testing machines which have been calibrated within a period not exceeding twelve months from the time of use by devices of accuracy traceable to the National Bureau of Standards of the United States Department of Commerce and, upon request, submit to CLIENT, or his authorized representative, documentation of such calibration. 1 6 Consider all reports to be the confidential property of CLIENT, and distribute reports only to the persons, organizations or agencies specifically designated in writing by CLIENT or his authorized representative. 1.'~ Retain all pertinent records relating to the services performed for a period of five years following submission of the report, during which period the records will be made available to CL1ENT at all reasonable times. AR,~;CLE 2 CLIENT'S RESPONSIBILITIES: CLIENT or his authorized representative will: 2. I Provide Texas CMT with all plans, specifications, addenda, change orders. ap- proved shop drawings and other information for the proper performance of Texas CMT. Issue authorization in writing, giving Texas CMT free access to THE PROJECT site, and to all shops or yards where materials are prepared or stored. 2 3 Designate in writing a person m firm to act as CLIENT's representative with respect to Texas CMT's services to be performed under this Agreement; such person or firm to have complete authority to transmit instructions, receive information and data, interpret and define CLIENT's policies and decisions with respect to THE PROJECT and to order, at CLIENT's expense, such technical services as may be requested by Texas CMT, 2.4 Designate in writing those persons or firms who are authorized to receive copies of Texas CMT's inspection and test reports. 2.5 Advise Texas CMT sufficiently in advance of any operations so as to allow for assignment of personnel by Texas CMT for completion of the required services. Such advance notice shall be in accordance with that established by mutual agreement of the parties. 2.6 Direct THE PROJECT contractor, either by the Construction Contract or direct written order to: (a) Secure and deliver to Texas CMT, without cost to Texas CMT, preliminary representative samples of those materials he proposes to use which require testing, together with any relevant data of the materials. (b) Furnish such casual labor and all facilities needed by Texas CMT to obtain and handle samples at THE PROJECT and to facilitate the specified inspection and tests. (c) Provide and maintain for the use of Texas CMT, adequate space at THE PROJECT for safe storage and proper curing of test specimens which must remain on THE PROJECT site prior to testing. ARTICLE 3. GENERAL CONDITIONS: 3.1 Texas CMT, by the performance of services covered hereunder, does not in any way assame, abridge or abrogate any of those duties, responsibilities or authorities with regard to THE PROJECT customarily vested in THE PROJECT architects, design engineers, or any other design agencies or authorities. 3.2 Texas CMT shall not be responsible for acts of omissions of any party or parties involved in the design of THE PROJECT or the failure of any contractor or subcontractor to construct any aspect of THE PROJECT in verbal recommendation issued by Texas CMT. 3 3 Texas CMT is not authorized to revoke, alter, relax, enlarge or release any requirement of TIlE PROJECT specifications or other contract documents nor to approve or accept any portion of the work, unless specifically authorized in writing by CLIENT or his authorized representative. Texas CMT shall not have the right of rejection or the right m stop the work, except for such periods as may be required to conduct the sampling, testing or inspection of operations covered by the Agreement. 3.4 This Agreement may be terminated by either party on ten (10) days written notice or by mutual agreement. If this Agreement is terminated by either party, Texas CMT shall be paid in full for all services performed through the termination date. and the CLIENT shall be provided with a complete report of the results of test and analysis conducted prior to termination. 3.5 Neither CLIENT nor Texas CMT may delegate, assign, sublet or transfer his duties or interest in this Agreement without the written consent of the other party. 3.6 The only WARRANTY made by Texas CMT in connection with its services per-formed hereunder is that it will use that degree of care and skill as set forth in Article 1.1 above. No other WARRANTY, expressed or implied, is made or intended for services provided hereunder or furnishing oral or written reports of Endings made. ARTICLE 4. INSURANCE: 4.1 Texas CMT shall secure and maintain throughout the full period of this Agreement sufficient insurance to protect it adequately from claims under applicable Workmen's Compensation Acts and from claims for bodily injury, death or property damage as may arise from the performance of services under this Agreement. Texas CMT will. upon request, file certification of such insurance coverage with CLIENT or his authorized representative, Within the limits and conditions of such insurance, Texas CMT agrees to indemnify and save CLIENT harmless from and against any loss, damage, or liability arising from any negligent acts by Texas CMT its agents, staffand consultants employed by it. Texas CMT shall not be responsible and CLIENT shall indemnify Texas CMT for any loss. damage or liability arising from any negligent acts by CLIENT, its agents, staff, and other consultants employed by it, and any claim asserted against Texas CMT unless it shall be determined that such claim is based on and resulted from failure by Texas CMT to perform its services hereunder in accordance with this Agreement, 4.2 No insurance, of whatever kind or type, which r.;.5 5c :afraid b3 Texas CMT. is to be considered as in any way limiting the contractor's or subcontractor's responsibility for damages resulting from his operations or for furnishing work and materials to THE PROJECT. CLIENT agrees, therefore, to include, or cause to be included in THE PROJECT's performance bonds to be secured and maintained by THE PROJECT contractor as CLIENT deems adequate to indemnify CLIENT, Texas,~MT, and other concerned parties, against claims for aamages anu to insure compliance of work performance and materials with THE PROJECT ARTICLE 5. PAYMENT: 5.1 CLIENT will pay Texas CMT for services and expenses in accordance with the attached fee schedule (Exhibit A). Texas CMT will submit progress invoices to CLIENT monthly and a final invoice upon completion of its work. Each invoice, on presentation, is due and payable by CLIENT or his authorized representative. 5.2 Texas CMT shall be paid in full for all services under the Agreement, including any additional services in excess of those stated in the original Agreement, as specifically authorized by CLIENT 5.3 The CLIENT's obligation to pay for the work contracted is in no way dependent upon the CL1ENT's ability to obtain financing, approval of governmental or regulatory agents, or upon the CLIENT's successful com- pletion of the project. ARTICLE 6. EXTENT OF AGREEMENT: The Agreement, including these terms and conditions, represents the entire agreement between CLIENT and Texas CMT and supersedes all prior Agreement may be amended only by written instruments signed by CLIENT and Texas CMT. ARTICLE 7. APPLICABLE LAW: The Agreement shall be governed by the laws of the State of Texas. 214.352-6957 Texas CMT, Inc. Fee Schedule WWW. texascrnt, corn 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.II 1.12 1.13 1.14 1.15 1.16 1.17 1.18 EXHIBIT "A" SCHEDULE OF SERVICES AND FEES CONSTRUCTION MATERIALS ENGINEERING SERVICES (Effective April 2005) ASPHALTIC CONCRETE/BITUMINOUS MATERIALS OBSERVATION/TESTING: 1.1 Asphaltic concrete mix designs a. Hveem Method, one asphalt content ................................. 300.00 b. Marshall Method, one asphalt content ............................... 375.00 c. Marshall Method, four asphalt contents .............................. 725.00 Confirmation Mix Design, using design prepared by others ............. At Unit Prices Observation/sampling at batch plant or jobsite, per man_hour .................. 41.00 Rolling Pattern Field Nuclear Density Tests, (minimum of 3 per trip), each ....... 39.00 Asphaltic Concrete Coring, per diameter-inch ............................... 2.75 Laboratory Density of Pavement Cores, each ............................... 23.00 Molding Test Specimens (3 per set), set ................................... 50.00 Density and Percent Voids (3 per set), set .................................. 50.00 Hveem Stabilimeter Value (3 per set), set .................................. 75.00 Marshall Stability (3 per set), set ......................................... 75.00 Marshall Flow Value (3 per set), set ...................................... 15.00 Sand Equivalent, each ................................................. 71.00 Extraction, each ..................................................... 165.00 Specific Gravity of Aggregates, each ..................................... 47.00 Sieve Analysis of Aggregates, each ....................................... 47.00 Evaluation of Built-up Roofing Membrane, each ........................... 280.00 Maximum Theoretical Density, each ..................................... 145.00 Solvent Disposal Charge, each ........................................... 29.00 Revision Date: April, 2005 Page 1 PORTLAND CEMENT CONCRETE AND AGGREGATES OBSERVATION/TESTING Texas CMT, Inc. Fee Schedule 2.1 Portland Cement Concrete Mix Design, including Specific Gravities, Absorptions, Unit Weights of Aggregates, and Gradations ............................... 165.00 2.2 Additional Mix Design (using same aggregates), each ........................ 120.00 2.3 Confirmation Mix Design Test Cylinders, each .............................. 28.00 2.4 Confirmation Mix Design Test Beams, each ................................. 28.00 2.5 Concrete Observation, per hour ........................................... 41.00 2.6 Concrete Test Cylinders (without observation), each .......................... 26.00 2.7 Concrete Test Beams (without observation), each ............................. 31.00 2.8 Concrete Test Cylinders (with observation), each ............................. 21.00 2.9 Concrete Test Beams (with observation), each ............................... 24.00 2.10 Hold Cylinders, each .......................................... See Rates Above 2.11 Concrete Reinforcing Steel Observation (Shop or Field), per hour ............... 41.00 2.12 Air Content Measurement when not making cylinders or beams (minimum three hours technician time), each ................................ 24.00 2.13 Unit Weight of concrete when not making cylinders or beams (minimum three hours technician time), each ................................ 24.00 2.14 Specific Gravity, each .................................................. 47.00 2.15 Absorption, each ...................................................... 22.00 2.16 Gradation (ASTM C-136),each .......................................... 47.00 2.17 Sieve Analysis (material finer than #200 U.S. Sieve), each ..................... 26.00 2.18 Sulphate Soundness a. Five Cycles, each ................................................ 255.00 b. Each additional cycle .............................................. 72.00 2.19 Concrete Coring with Technician Time, per diameter-inch ...................... 2.75 2.20 Capping and Testing Concrete Cores, each .................................. 26.00 2.21 Sawing Core Ends, per end ............................................... 9.50 Revision Dste: April, 2005 Page Texas CMT, Inc. Fee Schedule WWW, texascrnt, com 2.22 Compressive Strength of brick, block or grout per specimen .................... 28.00 2.23 Flexural Strength of brick or block, per specimen ............................ 34.00 2.24 Non-destructive Concrete Testing (excludes expendable materials), per hour ....... 71.00 2.25 Compressive Strength of 2 Block Prism, each ............................... 52.00 III. SOIL OBSERVATION/TESTING 3.1 Continuous Observation and Testing of earthwork by Technician with nuclear gauge, per hour ....................................................... 50.00 3.2 In-Place Moisture-Density Tests (minimum of 3 tests per trip) a. Nuclear Method, each 39.00 b. Other Methods, each .......................................... By Request 3.3 Material Sampling, per hour ............................................. 41.00 3.4 Moisture Content, each .................................................. 6.00 3.5 Atterberg Limits ( including Liquid and Plastic Limits), each ................... 50.00 3.6 Linear Bar Shrinkage, each .............................................. 21.00 3.7 Slaked and Washed Sieve Analysis a. Materials processed over No. 40 U.S. Sieve, each ........................ 26.00 b. Materials processed over No. 200 U.S. Sieve, ASTM D-422, each ........... 26.00 3.8 Hydrometer Analysis (including sieves), each .............................. 200.00 3.9 3.10 Gradation of Lime Stabilized Soil per TSDHPT, Item 260, per hour (minimum of 3 hours per trip) ..................................... 41.00 Preparation of Base Materials Binder for testing, each ......................... 26.00 3.11 3.12 3.13 Maximum and Minimum Density Tests, each ............................... 115.00 Specific Gravity Tests, each ............................................. 47.00 Moisture-Density Relationship a. Standard Method, ASTM D-698 or AASHTO T-99, each ................. 175.00 b. Modified Method, ASTM D-1557, AASHTO T-180 or TEX-113E, each .... 185.00 c. TSDHPT Method TEX-114E, each .................................. 260.00 3.14 Moisture-Density Relationship with lime or cement a. Standard Method, ASTM D-698 or AASHTO T-99, each ................. 190.00 b. Modified Method, ASTM D-1557, AASHTO T-180, or TEX-113E, each .... 200.00 c. TSDHPT Method TEX-114E, each .................................. 270.00 Rev/sion Date: April, 2005 Page 3 Texas CMT, Inc. Fee Schedule www, texascmt, com 3.15 TSDHPT Triaxial Series, TEX-117E, each ............................. By Request 3.16 TSDHPT Wet Ball Mill Analysis, TEX-116E, each .......................... 210.00 3.17 Los Angeles Abrasion (small aggregate), each .............................. 210.00 3.18 Sample Preparation for L.A. Abrasion or Wet Ball Mill Analysis, each aggregate ........................................................ 41.00 3.19 California Bearing Ratio (CBR), laboratory performed a. Native materials, per specimen ...................................... 300.00 b. Lime or cement treated, per specimen ................................ 330.00 3.20 Strength and Durability of Cement Stabilized Soils a. Curing and testing of Compression Samples, each .................. By Request b. Wet-Dry Test, ASTM D-559 or AASHTO T-135, each .............. By Request c. Freeze-Thaw Test, ASTM D-560 or AASHTO T-136, each ........... By Request d. Preparation of Samples for a, b, or c, each ......................... By Request 3.21 Phenolphthalein Lime Indicator Charge, per trip ............................. 12.50 IV. OBSERVATION/TESTING OF STRUCTURAL STEEL/WELDING 4.1 Ultrasonic/Magnetic Particle/Liquid Penetrant by Level II Technician with equipment (portal to portal) per hour including standby .................... 57.00 4.2 Visual Observation a. Structural Steel/Welding Observation - (Shop or Field), per hour ............ 51.00 (4 hour minimum, portal to portal) 4.3 Witness of Welders Qualification in Field Plate or Pipe Test, per hour (4 hour minimum, portal to portal) .................. 51.00 4.4 Welders Qualification at our laboratory a. Pipe Test - AWS or ASME 1 position - 6" Schedule 40 ......................................... 115.00 2 position - 6" Schedule 40 ......................................... 160.00 I position - 6" Schedule 80 ......................................... 115.00 2 position - 6" Schedule 80 ......................................... 160.00 b. Plate Test - AWS or ASME (inc. all mats and testing in laboratory) 1 position - limited thickness, 3/8" plate ............................... 120.00 2 position - limited thickness, 3/8" plate .............................. 160.00 1 position - unlimited thickness, 1" plate .............................. 115.00 2 position - unlimited thickness, 1" plate .............................. 160.00 4.5 Plate Test - Texas Highway Department Standard Specification 1 position - 1" plate ................................................... 190.00 2 position - 1" plate ................................................... 310.00 Revist~n Date: April, 2005 Page 4 Texas CMT, Inc. Fee Schedule 4.6 Tensile Strength Tests (50.00 min. charge - machine costs, sampling extra) a. Reduced Sections 10 or less, each 11 or more, each ................................................... 50.00 b. Reinforcing Steel .................................................. 45.00 # 3 to # 10, each ................................... 45.00 # 11 to # 18, each ................................................. 50.00 V. PROFESSIONAL/TECHNICAL SERVICES 5.1 Typist, per hour ....................................................... 41.00 5.2 Engineering Inspector/Technician, per hour ................................. 41.00 5.3 Field Supervisor, per hour ............................................... 75.00 5.4 Draftsman, per hour .................................................... 80.00 5.5 Staff Engineer, per hour ................................................. 85.00 5.6 Project Geotechnical Engineer, per hour .................................... 95.00 5.7 Engineering Manager, per hour .......................................... 1 I0.00 5.8 Principal Engineer, per hour ............................................ 140.00 5.9 Expert Witness, Depositions, Testimony by Principal Engineer, per hour ......... 185.00 VI. GENERAL NOTES 6.1 6.2 Minimum charge for report .............................................. 37.00 Reproduction, per page .................................................. 0.34 Hourly rate quoted at regular rate only (portal to portal), Mondays to Fridays, 7:30 am- 5:00 pm 6.3 Vehicle Transportation Charges for Ail Field SeDqces Per one-half day within 30 miles of laboratory, per trip ........................26.00 Over four hours within 30 miles of laboratory, per trip ........................ 48.00 Outside of these parameters ......................................... By Request 6.4 Subsistence, per man-day .............................................. 105.00 6.5 All direct expenses required/approved .............................. Cost plus 15% 6.6 Terms of payment ........................................... Due Upon Receipt Finance charge past 30 days 1 1/2% per month, annual rate ...................... 18% Revision Date: April, 2005 Page 5