Loading...
Sherwood Park 2-CS 850430GINN, INC. CONSULTING ENGINEERS April 30, 1985 General Homes Attn: Mr. Skip Hynek Sherwood Park II -- Final Acceptance Dear Mr. Hynek: Final inspection for the above referenced project was conducted by representatives of the City of Coppell, M.U.D. No. II, and Ginn, Inc. The work performed meets all requirements set forth by City standards and is acceptable to all parties mentioned. The portfolio of test reports and aa-built drawings have been received by Mr. Steve Goram, including the one-year maintenance bonds which will become active on the date of this letter. Contractors involved with the project are listed below: Paving Contractor: Southwestern Contracting Co. 2720 Stemmons Freeway, Suite 305 Dallas, Texas 75207 631-1732 Utility Contr'actor: M.-Co Construction Co. P.O. Box 27 Euless, TX 76039 (817) 831-3163 Sincerely, H. Wayne Ginn, P.E. City Engineer i /Hw /ar CC: Steve Goram C. B. Rodgers Phillip Pfeffer Steve Turner Jeff Hawkins Randy Fleming 16135 Preston Road · Suite 106 * Dallas, Texas 75248 * Phone 214/386-6611