Sherwood Park 2-CS 850430GINN, INC.
CONSULTING ENGINEERS
April 30, 1985
General Homes
Attn: Mr. Skip Hynek
Sherwood Park II -- Final Acceptance
Dear Mr. Hynek:
Final inspection for the above referenced project was
conducted by representatives of the City of Coppell, M.U.D.
No. II, and Ginn, Inc. The work performed meets all
requirements set forth by City standards and is acceptable to
all parties mentioned. The portfolio of test reports and
aa-built drawings have been received by Mr. Steve Goram,
including the one-year maintenance bonds which will become
active on the date of this letter.
Contractors involved with the project are listed below:
Paving Contractor:
Southwestern Contracting Co.
2720 Stemmons Freeway, Suite 305
Dallas, Texas 75207
631-1732
Utility Contr'actor:
M.-Co Construction Co.
P.O. Box 27
Euless, TX 76039
(817) 831-3163
Sincerely,
H. Wayne Ginn, P.E.
City Engineer
i /Hw /ar
CC:
Steve Goram
C. B. Rodgers
Phillip Pfeffer
Steve Turner
Jeff Hawkins
Randy Fleming
16135 Preston Road · Suite 106 * Dallas, Texas 75248 * Phone 214/386-6611