Sherwood Park 2-CS 840813GINN, INC.
August 13, 1984
CONSULTING ENGINEERS
Mr. Sam Wyse
GENERAL HOMES
15301 Dallas Parkway
Suite 1020
Dallas, TX 75248
Re: Sherwood Park I - Final Acceptance
Dear Mr. Wyse:
A final inspection of the above referenced project was conducted on
August i0, 1984. Previous punch list items are now in compliance with
the minimum standard requirements, and the project is acceptable to the
City of Coppell. The one-year maintenance bonds and as-built plans have
been received by Steve Goram from both contractors. As of this date,
permits can be issued to start construction on the home building in the
limits of this phase.
Sincerely,
GINN, INC.
H. Wayne Ginn, P.E.
HWG:sr
cc: Ron Ragland
Dean Youngblood
Steve Goram
Jeff Hawkins
Austin Paving Co.
Crawford Utilities
Randy Fleming