Loading...
Sherwood Park 2-CS 840813GINN, INC. August 13, 1984 CONSULTING ENGINEERS Mr. Sam Wyse GENERAL HOMES 15301 Dallas Parkway Suite 1020 Dallas, TX 75248 Re: Sherwood Park I - Final Acceptance Dear Mr. Wyse: A final inspection of the above referenced project was conducted on August i0, 1984. Previous punch list items are now in compliance with the minimum standard requirements, and the project is acceptable to the City of Coppell. The one-year maintenance bonds and as-built plans have been received by Steve Goram from both contractors. As of this date, permits can be issued to start construction on the home building in the limits of this phase. Sincerely, GINN, INC. H. Wayne Ginn, P.E. HWG:sr cc: Ron Ragland Dean Youngblood Steve Goram Jeff Hawkins Austin Paving Co. Crawford Utilities Randy Fleming 16135 Pre,ton Road" Suite 106 ® Dallas. Tcxm 75248 · Phone 214 386-6e, It