Smart Start-CS 990629Project:
Date:
DEVELOPMENT FEE TABLE
Smart Start School - Fee Addendum
6/29/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $I, 125.00 $1,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee 0rrigation/Fireime) $1,963.50
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Iss~ance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Iss-nnce of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project Il
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project ~
Construction Inspection Fee Information not Available
TOTAL $3,168.50
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROYAL $1,125.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Smart Start School- Fee Addendum
DATE: 6/29/99
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
0 = 0 ESU's
0 = 0 ESU's
I - 6 inch = 2.5 ESU's
Total #: 2.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: I Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due pdor to issuance of building permit)
(Ail other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total 0: 0 Irrigation Meter(s) @ $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) ~} $1,963.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 0: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$450.00 ea.
Wastewater Impact Fee:
Total Domestic Metem ESU's:
Wastewater Tap Inspection Fee:
Total #: 0 Connections ~} $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$~,125.00
$50.00
$o.oo
$o.oo
$0.00
$1,963.50
· $0.00
$o.oo
$o.oo
$0.00
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * PrelJmlnary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$0.00
$0.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
P.O. 8~ 4'78
C.c~x~. TX 75019
~: ~70
ENGINEERITVG DEPARTMENT
FAX COVER SItEET
Phone= ~ ,/.,7/ (inctucling
Cow~r
sheet)
TO,'I
8~0'0N
0~£ P0£ PT2
L~: £ T 66/6~/90