Loading...
Smart Start-CS 990629Project: Date: DEVELOPMENT FEE TABLE Smart Start School - Fee Addendum 6/29/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $I, 125.00 $1,125.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee 0rrigation/Fireime) $1,963.50 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Iss~ance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Iss-nnce of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Il Street Sign Fee Information not Available (100% due prior to Acceptance of Project ~ Construction Inspection Fee Information not Available TOTAL $3,168.50 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROYAL $1,125.00 DEVELOPMENT FEE WORKSHEET PROJECT: Smart Start School- Fee Addendum DATE: 6/29/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 0 = 0 ESU's 0 = 0 ESU's I - 6 inch = 2.5 ESU's Total #: 2.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: I Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due pdor to issuance of building permit) (Ail other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total 0: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) ~} $1,963.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $450.00 ea. Wastewater Impact Fee: Total Domestic Metem ESU's: Wastewater Tap Inspection Fee: Total #: 0 Connections ~} $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $~,125.00 $50.00 $o.oo $o.oo $0.00 $1,963.50 · $0.00 $o.oo $o.oo $0.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * PrelJmlnary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $0.00 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 P.O. 8~ 4'78 C.c~x~. TX 75019 ~: ~70 ENGINEERITVG DEPARTMENT FAX COVER SItEET Phone= ~ ,/.,7/ (inctucling Cow~r sheet) TO,'I 8~0'0N 0~£ P0£ PT2 L~: £ T 66/6~/90