Loading...
Solomon Dental-CS 980716 P.O. ~ox 4?8 Coppell, Texas 75019 972-462-0022 The City With A Beautiful Future FO. 80X 478 COPPELL, TEXAS 75019 Michael Lease Structures and Interiors, Inc. 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 $oloman Dental Bui]rlln~ Development Fee .~sesiln~t July 16, 1998 Dear Mr. Lease: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $3,730.49 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help ns to verif~ the payment of required fees and insure a successful beglnnin$ of this project. We look forward w working with you on this project. If you have any questions, please contact me. ~ M/~, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician GI~Ul ttoLlowall~ Assistaf~ Direc~ of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Soloman Dental Building Date: 7/16/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $57.75 (100% due at Issuance of Water Meter) Water Meter Fee (lrrigation/Fireline) $57.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee ~ $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/.~ (100% due prior to Council Approval) Roadway Impact Fee $355.49 $355.49 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Projec available at this time Street Sign Fee Information not (100% due prior to Acceptance of Pmjec available at this time Construction Inspection Fee Need submitlal of development contracts FOTAL $4,110.99 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,730.49 D~VELOPMENT FEE WORKSHEET PROJECT: $oloman Dental Building DATE: 7/16/98 Water Impact Fee: Domestic Meter(s): Irrigation Metar(s): Firellne Meter(s): 1 - 1 inch 1 -1 inch = 2.5 ESU's = 2.5 ESU's = ESU's = ESU's Total #: 5 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections ~ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $57.75 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: I In'igation Meter(s) ~ Total #: 0 Additional Irrigation Meter(s) ~ Total #: 0 Fireline Meter(s) ~ (100% due prior to issuance of water meters) $57.75 Domestic Water Meter Deposit Fee: Total #: I Metar(s) ~ $35.00 ea. (100% due prior to issuance of water meters) Irrigafloa/Fire Meter Deposit Fee: Total #: I Meter(s) @ $30.50 ea. (100% due prior to issuance of wafar meters) Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $2,250.00 $150.00 $57.75 $57.75 $o.oo $5.00 $35.00 $1,125.00 $50.oo $50.50 Page 1 UEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family ~} $150.00 / Lot Multi-family ¢~ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family ~} $350.00 / Lot Multi-family ~} $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Prelimln~ry plat approved after October 26, 1993: N/A N/A Single-family ¢~ $1285.00 / Lot Multi-family ~} $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting lees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $355.49 []]formation no{ available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information no~ available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development conn-ac~s P~e2 ROJ~DWAY IMPACT FEE CALCUIT~TIONS PROJECT: DATE: Soloman Dental 7/16/98 ROADWAY IMPACT FEE: Service Area * 1 Category ** Office Laird Use ** General Office Building Buildi.~ Size (Sq. Ft.) 2,815 Development Units ** 2.815 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Imp. act Fee due a (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $3,369.56 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Ira?act Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1980 Onivest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in sen, ice area 1 for all projects concerning Def~ton Tap Rd. & Sandy Lake Rd. and divide the Amoullt of Redaction remainder by the total coat of all the proJects in the se~ice area. The calculated percentage is 10.55. $3,014.07