Solomon Dental-CS 980716 P.O. ~ox 4?8
Coppell, Texas 75019
972-462-0022
The City With A Beautiful Future
FO. 80X 478
COPPELL, TEXAS 75019
Michael Lease
Structures and Interiors, Inc.
2855 Exchange Blvd., Suite 300
Southlake, TX 76092
$oloman Dental Bui]rlln~
Development Fee .~sesiln~t
July 16, 1998
Dear Mr. Lease:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $3,730.49 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help ns to verif~ the
payment of required fees and insure a successful beglnnin$ of this project. We look forward
w working with you on this project. If you have any questions, please contact me.
~ M/~, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
GI~Ul ttoLlowall~ Assistaf~ Direc~ of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Soloman Dental Building
Date: 7/16/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $57.75
(100% due at Issuance of Water Meter)
Water Meter Fee (lrrigation/Fireline) $57.75
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee ~ $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/.~
(100% due prior to Council Approval)
Roadway Impact Fee $355.49 $355.49
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Projec available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Pmjec available at this time
Construction Inspection Fee Need submitlal of
development contracts
FOTAL $4,110.99
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,730.49
D~VELOPMENT FEE WORKSHEET
PROJECT: $oloman Dental Building
DATE: 7/16/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Metar(s):
Firellne Meter(s):
1 - 1 inch
1 -1 inch
= 2.5 ESU's
= 2.5 ESU's
= ESU's
= ESU's
Total #: 5 ESU's ~ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections ~ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: I Domestic Meter(s) @ $57.75
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: I In'igation Meter(s) ~
Total #: 0 Additional Irrigation Meter(s) ~
Total #: 0 Fireline Meter(s) ~
(100% due prior to issuance of water meters)
$57.75
Domestic Water Meter Deposit Fee:
Total #: I Metar(s) ~ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigafloa/Fire Meter Deposit Fee:
Total #: I Meter(s) @ $30.50 ea.
(100% due prior to issuance of wafar meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
2.5
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$2,250.00
$150.00
$57.75
$57.75
$o.oo
$5.00
$35.00
$1,125.00
$50.oo
$50.50
Page 1
UEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family ~} $150.00 / Lot
Multi-family ¢~ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family ~} $350.00 / Lot
Multi-family ~} $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Prelimln~ry plat approved after October 26, 1993:
N/A
N/A
Single-family ¢~ $1285.00 / Lot
Multi-family ~} $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting lees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development,
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$355.49
[]]formation no{
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information no~
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development conn-ac~s
P~e2
ROJ~DWAY IMPACT FEE CALCUIT~TIONS
PROJECT:
DATE:
Soloman Dental
7/16/98
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Office
Laird Use ** General Office Building
Buildi.~ Size (Sq. Ft.) 2,815
Development Units ** 2.815
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Imp. act Fee due a (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $3,369.56
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Ira?act Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1980 Onivest agreement this property can not be assessed for Denton Tap Rd. &
Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in
sen, ice area 1 for all projects concerning Def~ton Tap Rd. & Sandy Lake Rd. and divide the Amoullt of Redaction
remainder by the total coat of all the proJects in the se~ice area. The calculated percentage
is 10.55. $3,014.07