Loading...
Sherrill Acres-CS010208 (2)SENT BY: CITY OF OOPPELL; §7~ 30& 70~; JUN-~-O~ PRO3ECT: DATE: D'E' VELOPHENT FEE WORKSHEET Sherrill /Icres, Lot 1, Block I (Sherrlll Veterinary Clinic) Z~OI Water Impact Fee: Domestic Meter(s): [rrigat/on Meter(s): FIreline Hater(s).' 1 - 1 1/2 inch -~ $ ESU's 1 - S/8 inch X 3//~ Inch = ! __ ESU's 0 = 0 ESU'$ I - 8 inch = 2.S ESU's Total # 8.5 ESU's O $450.00 ea. '(100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #.~3 Connections @ SS0.oo ea. (Single family due prior to Issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total # I Domestic Meter(s) @ ~;137.81 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigatioa/Fireline Water Meter Fee: Tob31 # I Irrigation Meter(s) ~ ~26.57 '-- Total # 0 Additional IrrlgaUon Meter(s) @ ~0.00 Total #~ Fireline Meter(s) 0 $2,157.38 (]00% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #._._[~Z Meter(s) @ $3S.00 ea. (100% due prior to issuance of water meters) IrrigationS'ire Meter Deposit Fee: Total # 2 Meter(s) @ $30.00 ea. (100% due prior to Issuance of water meters) Waslewater Impact Fee: Total Domestic Meters ESU's 5 O$450.00ea. Wastewater Tap Inspection Fee: To,al #~1 Connections ~ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total # 1 Lois @ $50.00 ea. (100% due prior to issuance of building Permit) ~3~825.00 ~[50.00 $137.81 $26,57 $0.00 $2f157.38 ~35.00 $60,00 $2r250.00 so.oo _ $50.00 Page BY: OZTY Or OOPP~LL; §?~ ~04 704t; JUN,I-O~ ~:4gPM; PAOE 4/6 DEVELOPMENT FEE WORI HE Park Fee (For Residential Developments Only): * Preliminary plat approved: __ 0 _ 5ingle4amily @ $0.00 per lot _ 0 Multi-family ~ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at isSuance of building permit) Roadway Impact Fee: (See attached fee c~lculation~) Street Lighting Fees: Assessed for lighting in the City's n'ght-of-way. This fee cannot be assessed until afl:er T.U. Electrk: submits the lighting plan for the pro~ed development. Once the plans are submitted, $292.~0 per light will be assessed. (~.00% clue prior to final acceptance of development) $1 733.06 InfotmaUon not Available Street Sign Fees: Assessed for signage In the City's right-of-way. (See attached fee calculations if applicable) information not Availebl~e Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The COntracts shou/d indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) _[n~ormaUon not AvailablP Page 2 DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINATION DATE: Sherrill Acres, Lot 1, BIk 1 2/8/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee Water Impact Fee 2/8/01 Wastewater Impact Fee 2/8/01 Street Sign Street Light Construction Inspection 4/2/01 Roadway impact-Zone 2/8/01 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS 2% & 4% $3,825.00 $2,250.00 $4,304.72 $1,733.06 Total Fees $12,112.78 $3,825.00 $2,250.00 notify street dept. $4,304.72 $1,733.06 Notify utility dept. when meters, taps or deposits are paid Fees Paid $12,112.78 Amount Owed $o.oo NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. ~ENT BY: CITY OF COPPELL; §72 304 7041; JUN:t-01 2:48PM; PAOE 2 DEVELOPMENT FEE TABL E Project: Skerrill ~4cres, Lot 1, Block 1 (Sherrill Veterinary Clinic) Date: TOTAL AMOUNT DUE FEES DUE PR/OR TO COUNCIL ~ ~ APPROVAL Water Impact Fee $3,825.00 $3,825.00, __ (10o r to Counc __ Water Tap Inspection Fee $150.00 _~..._.~100% due at Issuance of Water Me~cr..~.~l~ _.._ Water Meter Fee (Domestic) $137.81 ( 100% due at Issua,~c~ of Wator Meter) Water Meter Fee (Irrigation/Fireline) $2,183.95 (100% due at Is.~,,-_cc of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) IrfigationfFireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wa~tewater Tap Inspection Fee $50.00 __ (100% due at Issuance ofBuildin$ Pcrmit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin$ Permit) Park Fee $0.00 $0.00 (100% dae prior to Council Approval) Roadway Impact Fee $1,733.06 !$1,733.06 (100% due prior.to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available _ (I 00% due pri.or to Acceptance of Project ~ ,. Construction Inspection Fee Information not Available TOTAL $10,474.82 TOTAL AMOUNT DUll PRIOR TO COUNCIL APPROVAL $7,808.06 gENT BY: CITY 0ff COPPELL; PROJECT: DATE: 972 304 7041; JU~I-t-0t 2:4§PM; PAOE 5/6 ROAIYWAY I~[PACT FEE CALCUL~]'ION$ $k~rrili ,4¢rss, ZoI 1, ~lock I ($kerrill I/etertnary Clinic) ROAF}WA~ IMPACT Miles ** r Vehicle Mile *** Impact Fee due ~, (Development Units) 8 Office Office O~.er~ Not Specified 5,950 5.95 3.99 $73 * (Figure 2 - Roadway Impact Fee Study) '** (Table 3 - Roadway Impact Fee Study) (Schedule 2, Page 3 - Roadway Impact Fee Study)