Sherrill Acres-CS010208 (2)SENT BY: CITY OF OOPPELL; §7~ 30& 70~; JUN-~-O~
PRO3ECT:
DATE:
D'E' VELOPHENT FEE WORKSHEET
Sherrill /Icres, Lot 1, Block I (Sherrlll Veterinary Clinic)
Z~OI
Water Impact Fee:
Domestic Meter(s):
[rrigat/on Meter(s):
FIreline Hater(s).'
1 - 1 1/2 inch -~ $ ESU's
1 - S/8 inch X 3//~ Inch = ! __ ESU's
0 = 0 ESU'$
I - 8 inch = 2.S ESU's
Total # 8.5 ESU's O $450.00 ea.
'(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #.~3 Connections @ SS0.oo ea.
(Single family due prior to Issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total # I Domestic Meter(s) @ ~;137.81
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigatioa/Fireline Water Meter Fee:
Tob31 # I Irrigation Meter(s) ~ ~26.57
'-- Total # 0 Additional IrrlgaUon Meter(s) @ ~0.00
Total #~ Fireline Meter(s) 0 $2,157.38
(]00% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #._._[~Z Meter(s) @ $3S.00 ea.
(100% due prior to issuance of water meters)
IrrigationS'ire Meter Deposit Fee:
Total # 2 Meter(s) @ $30.00 ea.
(100% due prior to Issuance of water meters)
Waslewater Impact Fee:
Total Domestic Meters ESU's 5
O$450.00ea.
Wastewater Tap Inspection Fee:
To,al #~1 Connections ~ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total # 1 Lois @ $50.00 ea.
(100% due prior to issuance of building Permit)
~3~825.00
~[50.00
$137.81
$26,57
$0.00
$2f157.38
~35.00
$60,00
$2r250.00
so.oo
_ $50.00
Page
BY: OZTY Or OOPP~LL; §?~ ~04 704t; JUN,I-O~ ~:4gPM; PAOE 4/6
DEVELOPMENT FEE WORI HE
Park Fee (For Residential Developments Only): * Preliminary plat approved:
__ 0 _ 5ingle4amily @ $0.00 per lot
_ 0 Multi-family ~ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at isSuance of building permit)
Roadway Impact Fee:
(See attached fee c~lculation~)
Street Lighting Fees:
Assessed for lighting in the City's n'ght-of-way.
This fee cannot be assessed until afl:er T.U. Electrk: submits
the lighting plan for the pro~ed development.
Once the plans are submitted, $292.~0 per light will be assessed.
(~.00% clue prior to final acceptance of development)
$1 733.06
InfotmaUon not Available
Street Sign Fees:
Assessed for signage In the City's right-of-way.
(See attached fee calculations if applicable)
information not Availebl~e
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The COntracts shou/d indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
_[n~ormaUon not AvailablP
Page 2
DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIGINATION DATE:
Sherrill Acres, Lot 1, BIk 1
2/8/01
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
Water Impact Fee 2/8/01
Wastewater Impact Fee 2/8/01
Street Sign
Street Light
Construction Inspection 4/2/01
Roadway impact-Zone 2/8/01
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
2% & 4%
$3,825.00
$2,250.00
$4,304.72
$1,733.06
Total Fees
$12,112.78
$3,825.00
$2,250.00
notify street dept.
$4,304.72
$1,733.06
Notify utility dept.
when meters, taps
or deposits are paid
Fees Paid
$12,112.78
Amount Owed
$o.oo
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
~ENT BY: CITY OF COPPELL; §72 304 7041; JUN:t-01 2:48PM; PAOE 2
DEVELOPMENT FEE TABL E
Project: Skerrill ~4cres, Lot 1, Block 1 (Sherrill Veterinary Clinic)
Date:
TOTAL AMOUNT DUE
FEES DUE PR/OR TO
COUNCIL
~ ~ APPROVAL
Water Impact Fee $3,825.00 $3,825.00,
__ (10o r to Counc __
Water Tap Inspection Fee $150.00
_~..._.~100% due at Issuance of Water Me~cr..~.~l~ _.._
Water Meter Fee (Domestic) $137.81
( 100% due at Issua,~c~ of Wator Meter)
Water Meter Fee (Irrigation/Fireline) $2,183.95
(100% due at Is.~,,-_cc of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
IrfigationfFireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wa~tewater Tap Inspection Fee $50.00
__ (100% due at Issuance ofBuildin$ Pcrmit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin$ Permit)
Park Fee $0.00 $0.00
(100% dae prior to Council Approval)
Roadway Impact Fee $1,733.06 !$1,733.06
(100% due prior.to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project
Street Sign Fee
Information not Available
_ (I 00% due pri.or to Acceptance of Project ~ ,.
Construction Inspection Fee Information not Available
TOTAL $10,474.82
TOTAL AMOUNT DUll PRIOR TO COUNCIL APPROVAL $7,808.06
gENT BY: CITY 0ff COPPELL;
PROJECT:
DATE:
972 304 7041; JU~I-t-0t 2:4§PM; PAOE 5/6
ROAIYWAY I~[PACT FEE CALCUL~]'ION$
$k~rrili ,4¢rss, ZoI 1, ~lock I ($kerrill I/etertnary Clinic)
ROAF}WA~ IMPACT
Miles **
r Vehicle Mile ***
Impact Fee due ~, (Development Units)
8
Office
Office O~.er~ Not Specified
5,950
5.95
3.99
$73
* (Figure 2 - Roadway Impact Fee Study)
'** (Table 3 - Roadway Impact Fee Study)
(Schedule 2, Page 3 - Roadway Impact Fee Study)