Loading...
Sherrill Acres-CS010208SENT BY: CITY OF COPPELL; Jl '-01 2:48PM; PAGE t TO: gERVICE CENTER 972 304 7041 §72 304 704t; AT: §72,304,3547 Leslie Sherrill 152 Mockingbird Lane Coppell, TX 75019 COl'FELL February 8, 2001 RE: Sherrill Acres, Lot i, Block I (Sherrill Veterinary Clinic) Fee Assessment Letter Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the ammmt of ~ and forward to the Engineering Department along with a copy otthe Fee Assessment table. This amount is a portion of the azsessed fees that need to be p~id prior to Council approval. Also provide a copy of thc Engineer's estimate or contract to our office so the construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, znd utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jermifcr Amnstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief'Building Official Gary Sims, Director o£ Leisure Services DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NAT ON DATE: Sherrill Acres, Lot 1, BIk 1 2/8/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee Water Impact Fee $3,825.00 $3,825.00 2/8/01 Wastewater impact Fee $2,250.00 $2,250.00 2/8/01 Street Sign Street Light notify street dept. Construction Inspection $4,304.72 $4,304.72 4/2/01 Roadway Impact-Zone $1,733.06 $1,733.06 2/8/01 Street Cut Permit Overtime Inspection Water Tap inspection $150.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $137.81 Ware r Meter (Fi re/I rrig) $2,183.95 $126.57 8/9/01 Meter Deposit (Domestic) $35.00 $30.00 8/9/01 Meter Deposit (Fire/[trig) $60.00 Utility Final inspection $50.00 $50.00 Total Fees Fees Paid TOTALS $14,779.54 $12,319.35 2% & 4% 8/9/01 Amount Owed $2,460.19 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.