Loading...
Sherrill Acres-CS010309DEVELOPMENT FEES PROJECT NAME: Stuart O'Neal Office Building (Shadydale Acres Lot 2C) ENGINEER: ORIGINATION DATE: 3/9/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 3/9/01 Water Impact Fee $3,375.00 $3,375.00 3/9/01 3/9/01 Wastewater Impact Fee $1,125.00 $1,125.00 3/9/01 2%&4% Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS notify street dept. $1,181.44 $1,181.44 3/9/01 $5,314.68 $5,314.68 3/9/01 $150.00 $50.00 2/15/97 $50.0O $82.74 $2,240.12 $2,157.38 2/15/97 $35.00 $60.00 $30.00 2/15/97 $50.00 Total Fees Fees Paid Amount Owed $13,663.98 $13,233.50 $430.48 Prior To Construction Erosion Control Approved E.P.A.-N.O.I, Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. 07×20/2001 10:40 CITY OF CDPPELL ENGR. DEPT, a 9972~04~547 N0.021 ~02 DEVELOPMENT FEE WORKSHEET PROJECT: DATE; Water Impact Fee: I~oetlc MoW(e): In'igatlon Motor(i): Firoiiflo MeW(o): 1 - t in~ O 1 - 8 lnGh - 2.5 EeU'o = 2.6 ' EOUt ESU'o · 2.e,, _ EBU'i Toili I/: ?.6 ESU'i O M60.O0 (l~uo prim to Coun~ epprovei of ~o final plat) Water Tap ]uupeetlml Fee: Tote] #: [~JI Ob"llr devoJopmont,u duo ]0r'im' to ~m~dc W~r M~ [~ngle f~y due p~r ~ ~uance (~1 o~r doval~o ~uo p~r to Ioiuon~ ~ moW) lrrieldon/Flrdbe Water Meter Fee: ToW ~ I Irri0MMfl Melton[s) ~ TotoJ #: 0 . AddiltOnll Irrigation Meter(s) Teem #: I Firediflo Mater(m) O (100% dUO prior Io ii~enee of Wgter materu) S8~.74 Domdafle Witter Me, er Depoilt Fee: ToW ~: t MoW(s) G $3d.00 es. (l~uo pflor ~o IllUlnGt M Meter reelers) lrr~llJQm/~,e Meter DeFoiil Fee; Tom #: 2 MoW(s) ~ S30.(~ ea. Wutewiter Impact Fee: Total Dorr~stlc Maters EI~U's: 2.5 ~ 6450.00 em· Wastew&ler Tap lnfpeetlou Fee,* UffU~y PlnM lmJpectlou Fee (~di developments): &3.375.00 $160.00 S02.74 S36.00 $1,125.00 Page t 07/20/~001 10:40 _C.I_I~Y__O_F. COPPELL ENGR. DEPT. -~ cJ9723043547 N0.021 [~0~ DEVELOPMENT FEE TABLE TOTAL AMOUNT DUE I~ES DUE PRIOR TO COUNClI, ,, ,, API~OYAL (1~% due 8t him of,~r ~r) W~ Tap l~ion (1~s due it him Of BuildhI ~mO - - (I~S duc p~r m Coati Appro~) .... S~ SJ~ P~ lnfo~iou not Avl~ble ~ion ~;on Pee ln~mtiou ~ Available