Sherrill Acres-CS010309DEVELOPMENT FEES
PROJECT NAME: Stuart O'Neal Office Building (Shadydale Acres Lot 2C)
ENGINEER:
ORIGINATION DATE: 3/9/01
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
3/9/01 Water Impact Fee $3,375.00 $3,375.00 3/9/01
3/9/01 Wastewater Impact Fee $1,125.00 $1,125.00 3/9/01
2%&4%
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
notify street dept.
$1,181.44 $1,181.44 3/9/01
$5,314.68 $5,314.68 3/9/01
$150.00 $50.00 2/15/97
$50.0O
$82.74
$2,240.12 $2,157.38 2/15/97
$35.00
$60.00 $30.00 2/15/97
$50.00
Total Fees Fees Paid Amount Owed
$13,663.98 $13,233.50 $430.48
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I, Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
07×20/2001 10:40 CITY OF CDPPELL ENGR. DEPT, a 9972~04~547 N0.021 ~02
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE;
Water Impact Fee:
I~oetlc MoW(e):
In'igatlon Motor(i):
Firoiiflo MeW(o):
1 - t in~
O
1 - 8 lnGh
- 2.5 EeU'o
= 2.6 ' EOUt
ESU'o
· 2.e,, _ EBU'i
Toili I/: ?.6 ESU'i O M60.O0
(l~uo prim to Coun~ epprovei of ~o final plat)
Water Tap ]uupeetlml Fee: Tote] #:
[~JI Ob"llr devoJopmont,u duo ]0r'im' to
~m~dc W~r M~
[~ngle f~y due p~r ~ ~uance
(~1 o~r doval~o ~uo p~r to Ioiuon~ ~ moW)
lrrieldon/Flrdbe Water Meter Fee:
ToW ~ I Irri0MMfl Melton[s) ~
TotoJ #: 0 . AddiltOnll Irrigation Meter(s)
Teem #: I Firediflo Mater(m) O
(100% dUO prior Io ii~enee of Wgter materu)
S8~.74
Domdafle Witter Me, er Depoilt Fee:
ToW ~: t MoW(s) G $3d.00 es.
(l~uo pflor ~o IllUlnGt M Meter reelers)
lrr~llJQm/~,e Meter DeFoiil Fee;
Tom #: 2 MoW(s) ~ S30.(~ ea.
Wutewiter Impact Fee:
Total Dorr~stlc Maters EI~U's:
2.5
~ 6450.00 em·
Wastew&ler Tap lnfpeetlou Fee,*
UffU~y PlnM lmJpectlou Fee (~di developments):
&3.375.00
$160.00
S02.74
S36.00
$1,125.00
Page t
07/20/~001 10:40 _C.I_I~Y__O_F. COPPELL ENGR. DEPT. -~ cJ9723043547 N0.021 [~0~
DEVELOPMENT FEE TABLE
TOTAL AMOUNT DUE
I~ES DUE PRIOR TO
COUNClI,
,, ,, API~OYAL
(1~% due 8t him of,~r ~r)
W~ Tap l~ion
(1~s due it him Of BuildhI ~mO - -
(I~S duc p~r m Coati Appro~) ....
S~ SJ~ P~ lnfo~iou not Avl~ble
~ion ~;on Pee ln~mtiou ~ Available