Loading...
Sonic Addition-CS 940608 The City With A Beautiful Future ! PUBLIC WORKS___J Ju~ 8, 1994 Mr. Bill Anderson Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 ~ Assessment Dear Mr. Anderson: Enclosed is a copy of the revised City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Sonic Addition. The amount of $2,725.00 has previously been paid but, because of the change in the domestic water meter size an additional amount of $1,650 needs to be paid. Please provide a check made payable to the City of Coppell in the amount of $1,650 and forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or conU'act for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely,. Michael A. Martin, E.I.T. CCi Steve Goram; Director of Public Works Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Revised June 8,1994 Project: Sonic Addition TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL Water Impact Fee $ 3,250.00 $ 3,250.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 200.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 50.00 -0- (100% due at Iss-anee of Building Permit) Water Meter Fee (Domestic) $ 46.10 -0- (100% due at Issuance of B. ilding Permi0 Water Meter Deposit (Non-residential) $ 35.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 46.10 -0- (100% due at lssnance of Water Meters) Irrigation Meter Deposit $35.00 -0- (100% due at Iss. nnc~ of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- (50% due prior to Council Approval) (50% = ) (50% due prior to Issuance of Building Permit) (50% = ) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconst. Mtg.) contracts TOTAL $ 4,787.20 $ 4,375.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE TO: FRO~f RE: June 3, 1994 Engin. eering Depart~t Public Works Staff ~ Development Fees for Sonic Addition - Revised The following fees referenced project. Water Impact Fee: should be assessed and collected on the above Domestic Meter/s = 2.5 ESU's Irrigation Meter/s = 2.5 ESU's Fireline Meter/s = ESU's Total 5 100% due prior to Council ESU's @ $650.00 ea = $ 3,250.00 approval of the final plat. Wastewater Impact 1 - 1" Total 2.5 (city) Domestic Meter/s = 2.5 ESU's ESU's ~ $450.00 ea = ~ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections ~ $100.00 each = $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) ~ lots @ $50.00/10t = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) ~ - I" Domestic Meters @ $46.10 ea = S 46.10 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) ~ - ~" Irrigation Meter/s @ S 46.10 ea - Fireline Meter/s @ $ ea 100% due prior to issuance of water meter/s. = $ 46.10 = $ Water WeterDepo$it (Residential) Meters ~ S30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters.