Sonic Addition-CS 940603DA.TH
FROlf
RE:
COPPELL PUBLIC WORKS
June 3. 1994
Engineering Departm~
Public Works Staff T'
Development Fees for Sonic Addition - Revised
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 1" Domestic Meter/s = 2.5 ESU's
~ 1" Irrigation Meter/s = 2.5 ESU's
- Fireline Meter/s = __ ESU's
Total 5
100% due prior to Council approval
ESU's ~ $650.00 ea = $ 3,250.00
of the final plat.
Wastewater Impact (city)
1 - 1" Domestic Meter/s = 2.5 ESU's
Total 2.5 ESU's @ $450.00 ea = $ 1,125.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections ~ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections ~ $100.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (~11 Development)
~ lots ~ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Heter Fee (Domestic)
I - i" Domestic Meters ~ $46.10 ea = S 46.10
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water~etarFee
(Irrigation/Fireline)
Irrigation Meter/s ~ $ 46.10 ea
Fireline Meter/s @ $ ea
100% due prior to issuance of water meter/s.
= S 46.10
= $
Water Meter Deposit (Residential)
Meters @ $30.00 ea = $
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
1 Meters @ $35.00 ea = $ 35.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
1 Meters ~ $35.00 ea = $ 35.00
100% due prior to issuance of water meters.