Loading...
Sonic Addition-CS 940603DA.TH FROlf RE: COPPELL PUBLIC WORKS June 3. 1994 Engineering Departm~ Public Works Staff T' Development Fees for Sonic Addition - Revised The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1" Domestic Meter/s = 2.5 ESU's ~ 1" Irrigation Meter/s = 2.5 ESU's - Fireline Meter/s = __ ESU's Total 5 100% due prior to Council approval ESU's ~ $650.00 ea = $ 3,250.00 of the final plat. Wastewater Impact (city) 1 - 1" Domestic Meter/s = 2.5 ESU's Total 2.5 ESU's @ $450.00 ea = $ 1,125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections ~ $100.00 each = $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (~11 Development) ~ lots ~ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Heter Fee (Domestic) I - i" Domestic Meters ~ $46.10 ea = S 46.10 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water~etarFee (Irrigation/Fireline) Irrigation Meter/s ~ $ 46.10 ea Fireline Meter/s @ $ ea 100% due prior to issuance of water meter/s. = S 46.10 = $ Water Meter Deposit (Residential) Meters @ $30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters.