Sonic Addition-CS 940510The City With A Beautiful Future
May 10, 1994
uj,r---- .... ill Box 478
L .........
PUBLIC WORKS J
75019
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dalla% TX 75248
RE: Sonic Addition
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Sonic Addition.
Please provide a check made payable to the City of Coppell in the amount of $2,725.00 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List.
Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
Steve Ooram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date: May 10,1994
Project: Sonic Addition
TOTAL AMOUNT DUE
~ PRIOR TO
COUNCIL
Water Impact Fee $ 2,275.00 $ 2,275.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 200.00 -0-
(100% due at ls_~uanee of Building Permit)
Wastewater Impact Fee $ 450.00 $ 450.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100% due at Issuance of Building Permi0
Utility Fiaal Inspection Fee $ 50.00 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Domestic) $ 22.25 -0-
(100% due at Issuance of Building Permi0
Water Meter Deposit (Non-residential) $ 70.00 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Irrigation & Fire) $ 46.10 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit -0- -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee -0- -0-
(50% due prior to Council Approval) (50% = )
(50% due prior to Issuance of Building Permit) (50% = )
Construction Inspection Fee need submittal of -0-
(2% of Project Cost due prior to Preeonst. Mtg.) contracts
TOTAL $ 3,113.35
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 2,725.00
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
April 22, 1994
Engineering Department
Public Works Staff
Development Fees for Sonic Addition
The following fees
referenced project.
Water Impact Fee:
1 - 5/8" x 3/4"
1 - 1"
should be assessed and collected on the above
Domestic Meter/s = 1 ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s = ESU's
Total 3.5
100% due prior to Council approval of the final
ESU's @ $650.00 ea = $ 2,275.00
plat.
Wastewater Impact (city)
1 5/8" x 3/4" Domestic Meter/s =
Total 1 ESU's @ $450.00 ea =
1 ESU's
$ 45o.oo
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $100.00 each = $ 200.00
100% due'prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections ~ $100.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 22.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1" Irrigation Meter/s ~ $ 46.10 ea
- Fireline Meter/s @ $ ea
100% due prior to issuance of water meter/s.
= $ 46.10
= $
Water Meter Deposit (Residential)
Meters @ $30.00 ea = $
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $ 70.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea = $
100% due. prior to issuance of water meters.