Loading...
Sonic Addition-CS 940422COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: April 22, 1994 Engineering Department Public Works Staff Development Fees for Sonic Addition The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's - Fireline Meter/s = __ ESU's Total 3.5 ESU's ~ $650.00 ea = $ 2,275.00 100% due prior to Council approval of the final plat. Wastewater Impact (city) 1 - 5/8" x 3/4" Domestic Meter/s = Total 1 ESU's ~ $450.00 ea = 1 ESU's $ 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail,'industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections @ $100.00 each = $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - 1" (Irrigation/Fireline) Irrigation Meter/s ~ $ 46.10 ea Fireline Meter/s @ $ ea 100% due prior to issuance of water meter/s. = $ 46.1o = Water Meter Deposit (Residential) Meters @ $30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ $35.00 ea = $ 100% due prior to issuance of water meters.