Loading...
Coppell Post-CS 901115Unda A. Smm,,., ASLA Natural Design Concepts November 15, 1990 Wayne Ginn, P.E. Ginn, Inc. Consulting Engineers 17103 Preston Road Suite 100, LB-118 Dallas, Texas 75248 Dear Wayne, i ;,!tlV I 7 The review of the Coppell Post Office was held on November 5, 1990. The meeting was attended by Ron McCain, City of Coppell; Rick Stewart, Postal Service; Bill Borrows, Postal Service; and Richard Odlozil, Natural Design Concepts, Inc. The damages to the Postal Service Facility landscape and sprinkler system at Denton Tap and Bethel School Road caused by the construction of the Denton Tap Road improvements were discussed. The following items were noted as necessary repairs: Repair of irrigation system damaged during construction to include replacement of two Hunter Professional Series Gear-driven Rotor heads and restoration of applicable sprinkler water lines along Bethel School Road. Replacement of broken lateral lines and heads adjacent to Denton Tap Road and restoration of water service to the irrigation system. Recheck the system once repairs are made to assure proper operation of all areas and adjust as needed. Planting of a landscape barrier at the corner of Denton Tap and Bethel School Road consisting of a 4' wide planting bed of approximately 20' length with low growing shrubs and top mulch. Steel edging to be used around the bed area and sprinkler adjustments made if needed to provide coverage. The areas on both sides of the wheelchair ramp (Pavers) and the right of way area from the sidewalk to curb should be regraded and sodded with bermuda grass. Lower utility sleeves to lawn grade. Remove the concrete overpour by the utility light pole base. Please let me know if you have any questions about these items. These items can be repaired as the punch-list items for Denton Tap Road Landscape Improvements are being corrected. Sincerely, Llnda A. Smith, ASLA Natural Design Concepts, Inc.