Loading...
Coppell Post-CS 901114COPPELL PUBLIC WORKS DATE TO: FROM~ November 14, 1990 Steven G. Goram, Director of Public Works Rick Wieland, Manager of Parks and Recreation~ Postal Facility - Denton Tap Road Construction Damages Tickler 11/14/90 As I had indicated in my November 1, 1990 memorandum, an inspection of repairs to be made at the Coppell Postal facility took place on November 5, 1990, with representatives from Ginn, Inc., Staff and the Postal facility. The items discussed are detailed in the attached letter to Gabe Favre of November 12, 1990. Staff will continue to monitor these items to make sure that the contractor completes this process. I will update this matter by December 19, 1990. RSW/mp DNTPCONS.RSW