Loading...
PA9702-PT000627 PERMIT NO. 000627 COP NAME OF PERMITEE: City of Coppell The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on The application has been reviewed by the FLOODPLAIN ADMINSTRATOR and it has been determined that the proposed development is located within an identifiable floodplain of: The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of' the proposed development for conformance with the development standards required by COPPELL Floodplain Ordinance #94639. You are hereby authorized to proceed with the following described work: Construction of the Coppell Aquatic & Recreation Center per plans by Beinkley Sargent Architects, Inc. To maintain compliance with the development standards of COPPELL Hoodplain Ordinance#/94639 and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: (L,f Compliance with the development standards of Coppell Hoodplain Ordinance#/94639 including but not limited w: * For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100- year base flood elevation or one (I) foot above ultimate condition whichever is higher. Certification of the lowest floor must be submitted from a registered professional engineer, architect, or land surveyor. · For non-residential structures, the lowest floor (including basemen0 must be elevated or floodproofed to two (2) feet above the 100-year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification that the floodproofing methods are adequate to withstand the flood depths, pressure, velocities, impact and uplift forces and other factors associated with the base flood must be submitted from a registered professional engineer or architect. · For fill activities, the permittee must submit certification from a registered professional engineer or land surveyor that the level of the compacted ~l materials is at or above the elevation of the Base Flood. (/Certified copy of all final plans or As-Built Drawings must be submitted to the FLOODPLAIN ADMINISTRATOR. ( / OTHER PROVISIONS: Work in accordance with CLOMR dated 5/18/93 (93-06-091R). Final letter of map revision per Albect Halff study & contract with City to be obtained after construction> Acknowledgement of C itions by Permittee Date ' Signature of FLOODPJLAI~ ADMINISTRATOR Date