Loading...
Shadow Woods-CS 900626June 26, 1990 Mr. Derek Earle, P.E. Centex Real Estate Corporation 1660 South Stez~one, Suite 230 Lewisville, TX 75067 shadow Wood Estates Final Acceptance Dear Mr. Earle: A final inspection of the above referenced project has been confirmed by the City of Coppell. Paving and utilities have been verified and are in compli- ance with the City of Coppell'e standard requirements. The one-year maintenance bonds have been received from the utility and paving contractor. Maturity on the bonds will be one year from the date of this letter (June 25, 1991). The ss-built drawings have also been received from the Project Engineer, Nathan D. Meier, Consulting Engineering, Inc. If I can be of further assistance, please do not hesitate to contact me at 462-8495. Sincerely, Larry Davis Construction Inspector CLD/kkc Pat Crawford, Crawford Utilities Mike Daniel, P.E., Nathan D. Ma/er Jeffrey M. Hawkins, P.E., Pierce-LunsfordAssocietes, Inc. Barney Boydston, Centerline Contractors, Inc. Troy Glidwe]l, Fire Marshall Dorothy Timmone, City Secretary Dale Jackson, Building Official shohre Daneehmand, Acting City Engineer Howard Pafford, Water Superintendent Per Birdsall, Street Superintendent