Shadow Woods-CS 900626June 26, 1990
Mr. Derek Earle, P.E.
Centex Real Estate Corporation
1660 South Stez~one, Suite 230
Lewisville, TX 75067
shadow Wood Estates
Final Acceptance
Dear Mr. Earle:
A final inspection of the above referenced project has been confirmed by the
City of Coppell. Paving and utilities have been verified and are in compli-
ance with the City of Coppell'e standard requirements.
The one-year maintenance bonds have been received from the utility and paving
contractor. Maturity on the bonds will be one year from the date of this
letter (June 25, 1991). The ss-built drawings have also been received from
the Project Engineer, Nathan D. Meier, Consulting Engineering, Inc.
If I can be of further assistance, please do not hesitate to contact me at
462-8495.
Sincerely,
Larry Davis
Construction Inspector
CLD/kkc
Pat Crawford, Crawford Utilities
Mike Daniel, P.E., Nathan D. Ma/er
Jeffrey M. Hawkins, P.E., Pierce-LunsfordAssocietes, Inc.
Barney Boydston, Centerline Contractors, Inc.
Troy Glidwe]l, Fire Marshall
Dorothy Timmone, City Secretary
Dale Jackson, Building Official
shohre Daneehmand, Acting City Engineer
Howard Pafford, Water Superintendent
Per Birdsall, Street Superintendent