Loading...
Shadow Woods-CS 900222COPPELL PUBLIC WORKS DATE: TO: FROM: RE: February 22, 1990 Dale Jackson, Building Official Russell Doyl~y Enginee~ Request to Place Railroad Ties in the Drainage Easement Outside the Public Right-of-Way Along the West Side of Coppell Road (Second Response) In respect to subject request as per the attached sketches, we have no objection to this request as long as the improvements are outside the right-of-way and existing road ditches so they do not obstruct storm water drainage in the contiguous ditches. Also, be sure the improvements don't obstruct any side lot surface drainage. Please let me know if we can be of further service. RRD/bb XC: Steve Goram, Director of Public Works Shohre Daneshmand, P.E., Civil Engineer Larry Davis, Construction Inspector Ben dela Cruz, Engineering Technician SECOND.RRD " ' ,~:' - e:~t.c~TM for Co~pel~ RoAd