Loading...
ST9905-CS051215December 15, 2005 RE: Bethel Road 1 ST 99-05 Utility Relocations Dear Mr.: The Bethel Road I project consists of both roadway and channel improvements. Right-of-way acquisition and tree removal for the roadway portion (west city limits to east of Freeport Parkway) are complete. The channel improvements include a new four-barrel box culvert constructed across an unimproved section of Bethel Road east of Freeport Parkway. No additional right-of-way is being acquired for the installation of the multiple box culvert and utilities will be required to relocate in the existing right-of-way. Plans for the roadway and channel portions of the project have been previously provided to the franchise utilities. This project is scheduled to advertise in the 2na quarter of 2006. All franchise utilities impacted by the proposed improvements need to initiate relocations/adjustments. A Right-of-Way Use Permit Application and relocation plans need to be submitted to the city for approval prior to starting the relocations/adj ustments. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please advise. Sincerely, Suzan C. Taylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: sta¥1or(~a~,,ci.coppell.tx.us Comcast Cable Phillip Gwin, Construction Coordinator 1565 Chenault Street Dallas, Texas 75228 Time Warner Telecom Don Hurla, Outside Plant Engineering 15303 Dallas Parkway, Suite 600 Addison, Texas 75001 TXU Electric Delivery Company Jerry Bates 14400 Josey Lane Farmers Branch, Texas 75234 TXU Electric Delivery Company Richard Brewster 500 N. Akard Street, LP 14-125 Dallas, Texas 75201 Atmos Energy Doug Brewer, Project Management 200 N. Ector Drive Euless, Texas 76039 Atmos Energy Jeanne }looker 14032 Distribution Way Farmers Branch, Texas 75234 Verizon Karen Guiloreza 2094 McGee Lane Lewisville Texas 75077