November 08, 1996
Explorer Pipe_'ime~.Cn,~.~.th.~.e corner of Beltllne Rd. & Ledbetter
Development ~ ~--~-
Dear Mr Allen:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development. Please make payment to the
City of Coppell in the amount of $ 603.21 and forward to the Finance Department along with a
copy of the Fee Assessment table.
There is a question on how the water is to be used. It is my understanding that the water is for
washing equipment and employees hands. What I am unclear about is to what happens to the
runoff when the equipment is washed. Please provide a letter explaining the expected use of the
water service.
Providing a copy of your paid receipt to the Engineering Depa[hiient will help us m verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
K~J~M' Grif'~~' 'Sincerely' ~/.
Assistant City Manager/City Engineer
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project:
Date:
Explorer Pipeline Co.,
~ the southwest corner of Beltline Rd. & Ledbetter
11/8/96
TOTAL
FEES DUE
Water Impact Fee $450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $23.21
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Park Fee $0.00
(100 % due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee
(100% due prior to Acceptance of Project
Street Sign Fee
(100% due prior to Acceptance of Project
Construction Inspection Fee
tOTAL II
D=VELOPMENT FEE WORKSHE= r
PROJECT Explorer Pipeline Co. 0 the southwest comer of Beltline Rd. & Ledbetter
DATE: 11/8/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 5/8 inch X 3/4 inch = 1 ESU's
0 -0 = ESU's
= ESU's
0 - N/A = ESU's
Total #: 1 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter(s) @ $23.21
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter{s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter{s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
0
@$450.0Oea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Rnal Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$450.00
$50.00
$23.21
$0.00
$0.00
$0.00
$30.00
$0.00
$0.00
$0.00
$50.00
Page 1
Dt~VELOPMENT FEE WORKSHE,-T
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family O $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Prelimin:wy plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$0.00
N/A
Street Sign Fees:
Assessed for siflnage in the City's right-of-way.
(See attached fee calculations if applicable)
N/A
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)