Loading...
Summit PW-CS 961101The City With A Beautiful P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 01, 1996 Tom l~:~hlmsm Lincoln Properties ~00 North Akard/3300 Lincoln Plaza Dallas, TX 75201 Replnt of Lot 1, Block A, Northlake 635 Business Park (Lincoln Business Park) Development Fee Assessment Dear Mr Kuhlman: Enclosed is a copy of thc City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to thc City of Coppell in thc amount of $97,149.96 and forward to thc Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~) , AsSistant City"~Ulana~er/City Engineer Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services I VELOPMENT FEE TAB _, Project: Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln Business Park) Date: 11/1/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $15,525.00 $15,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $587.94 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,357.78 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $105.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $10,800.00 $10,800.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $70,824.96 $70,824.96 (100% due prior to Council Approval) Street Light Fee laformation not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $103,890.68 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $97,149.96 D~ELOPMENT FEE WORKSHE~' PROJECT: Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln Business Park) DATE: 11/1/96 Water hnpact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 3 - 2 inch = 24 ESU's I - 2 inch = 8 ESU's = ESU's 2 - 8 inch -- 2.5 ESU's Total 8: 34.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) $15,525.00 $300.00 $587.94 $195.98 $0.00 $5,161.80 $90.00 $105.00 $10,800.00 $150.00 $150.00 Water Tap Inspection Fee: Total 8: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 3 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total 8: 1 Irrigation Meter(s) @ $195.98 Total 8: 0 Additional Irrigation Meter(s) @ Total 8: 2 Fireline Meter(s) @ $2,580.90 (100% due prior to issuance of water meters) Water Meter Deposit Fee Total 8: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's 24 @$450.00 ea. Wastewater Tap Innpection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 D VELOPMENT FEE WORKSHE ' I' Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Mu)ti-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $70,824.96 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 c c h oss PROJECT: DATE: Replat of Lot 1, Block A, Northikae 655 Business Park (Lincoln Business Park) 11/1/96 ROADWAY IMPACT FEE: Service Area * 2ategory ** Use ** Buildi Size (Sq. vt.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) 10 General Light Industrial 222,720 222.72 1.06 $3OO $70,824.96 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) This fee is eligible for up to a 50% credit due to the original developer constructing Lakeshore & Crestside Drives. To be eligible for this credit, a letter from the original developer needs to be submitted assigning some of the credits to this development.