Summit PW-CS 960821Bruce Heller
Fults Co.
9400 North Central, 5th Floor
Dallas, Tx. 75231
Development ~ee Assessment
P.O. Box 478
Coppell, Texas 75019
214-462-0022
August 21, 1996
Dear Mr Heller:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $103,275.00 and forward to the
Finance Depaamem along with a copy of the Fee Assessment list. A copy of the Engineer's
estimate or contract will need to be provided to our department so the construction inspection
fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CC:
Bill Anderson, P.E., Dowdey Anderson & Associates, Inc.
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
Project: Summit ~ the Springs
Date: 8/21/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $31,500.00 $31,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,000.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,276.55
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $193.20
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,650.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $175.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $24,750.00 $24,750.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,750.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,750.00
(100% due at Issuance of Building Permit)
Park Fee $70,675.00 $70,675.00
(100% due prior to Council Approval)
Roadway Impact Fee $47,025.00 $47,025.00
(100% due prior to Council Approval)
Street Light Fee Information aot
(100% due prior to Acceptance of Project available at this tim~
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
$115,069.75
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $103,275.00
DEVELOPMENT FEE WORKSHEE1~
PROJECT: Summi~ ~ t~e Sprfngs
DATE: 8/21/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter{s):
Fireline Meter(s):
55 - 5/8 inch X 3/4 inch = 55
4 - 1 inch
1 -1 1/2 inch
0 N/A
= 10
= 5
Total 8: 70 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Ingpeetion Fee:
Total 8: 60 Connections @ $50.00 ea.
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total 8: 55 Domestic Meter{s) @ $23.21
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/F'weline):
Total 8: 4 Irrigation Meter{s) @
Total 8: I Additional Irrigation Meter{s) @
Total 8: 0 Fireline Meter{s) @
(100% due prior to issuance of water meters)
$48.30
$134.93
Water Meter Deposit Fee (Domestic):
Total 8: 55 Meter{s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 8: 5 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
55
@$450.00ea.
Wastewater Tap Inspection Fee:
Total #: 55 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 55 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$31,500.00
$3,000.00
$1,276.55
$193.20
$134.93
$0.00
$1,650.00
$175.00
$24,750.00
$2,750.00
$2,750.00
Page 1
DEVELOPMENT FEE WORKSHEL~
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
55
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$70,675.00
N/A
$47,025.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULA~I~ONS
PROJECT:
DATE:
Summit 0 tke Springs
8/21/96
ROADWAY IMPACT gEE:
Catetor~ **
Land Use **
Buildin~ Size (Sq. Ft.)
Development Units **
Vehicle Miles [~er Develo~nent Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles ~er Develolmlent Unit~ x (Fee ~er Vehicle Mile) =
5
Residential
Si~.le-Family Dem:h~
N/A
55
2.85
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)