Loading...
WA9801-CS 990602 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. Jo~ R~ CA~rF.P,, P.~. June 2, 1999 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell ' Post Office Box 478 Coppell, Texas 75019 Re: State Highway 121 Water Line Contractor's Schedule and Cash Flow Projection Dear Mr. Griffin: We are enclosing the schedule and cash flow projection for the State Highway 121 Water Line project as prepared by H & W Utility contractors. This submittal is a requirement of the contract documents and specifications and was requested by Mr. Mike Martin at the pre-construction conference for this project. We are available to discuss this project further at your convenience. Sinc~ Enclosure cc: Mr. Larry Davis ~ j:Xclerical\coppell\98-167Metters\const~X~chedule.doc I I I 'I I I I . , H & W Utility Contractors Cash Flow Projection City of Coppell State Highway 121 Water Line Estimated billing for: Gross Retainage Net June 39,795.70 3,979.57 35,816.13 July 64,539.40 6,453.94 58,085.46 August 75,882.44 7,588.24 68,294.20 180,217.54 18,021.75 162,195.79 Retainage 18,021.75 180,217.54