Loading...
Taco Bell-CS 960731:~UBLIC {/~ ,. 019 July 31, 1996 David Harper Buildtech P.O. Box 9152 Long View, TX 75608 RE: Taco Bell Final Acceptance Dear Mr. Harper: A final inspection of paving and utilities for the referenced project has been confmned by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Conmuction Inspector Kenneth M. Griffm, P.E., ACM/City Engineer Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Travis Cramp, Acting Fire Marshal Mike Martin, E.I.T., Asst. City Engineer file/ldavis/0fi~alac.ltr