Stonemeade-CS 930729COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 29, 1993 Larry Davis, Construction Inspector Howard L. Pafford, Utilities Superintendent Walk Through Stonemeade/Water Sanitary Sewer Field personnel conducted a follow-up walk through of the above referenced project and the following items remain deficient: . 1. Need valve extensions at main line valves at these lots: f/qt. Lot 11 on Brush Creek - 1 mainline valve and 1 fire hydrant valve. L?'l°f ~9.~~b. 16" tie-in at Tree Ct/Parkway, Crooked stack. (~)[~ 2. Lot 61 on Heartz Road - Replace bent setter. Parkway frontage at Lot 61. Also uncover sewer manhole on Lots 39, 40, and 56 - Deep sewer laterals. Manhole at Line A Tie-in - Smooth rough, jagged edges where top half of pipe was cut out. Lot 4 Line F - The Chimney seal not properly installed - no grout on outside ting. Lot 41 & 42 - Uncover existing 15" sanitary sewer manhole in easement. The screening wall contractor will have to set final grade in the tight-of-way and sidewalk will have to be completed along Parkway Blvd. Please have the contractor contact staff when all items have been corrected. This project should not be accepted until all punch list items are corrected. /dm WALKTHRU.HLP.STONMEAD.HLP